Home / Solutions / PV DC-Side Arc and Insulation Monitoring

PV DC-Side Arc and Insulation Monitoring

PV DC-side arc and insulation monitoring should currently be positioned as a candidate pilot, and cannot be directly described as a mature closed-loop DC safety solution. The DC applicability, range, certification, waveform, and interface of WSR and FA must be verified by specific model and technical documentation; ESX and the platform can only undertake data aggregation and recording. On site, the DC voltage, string structure, isolation method, inverter interface, and permitted test methods should first be confirmed, then a decision made on whether dedicated DC monitoring equipment needs to be introduced.

Electrical HazardsArc FaultInsulation Trends

Solution overview

The solution is used to organize PV DC-side risk investigation and controlled pilots, focusing on distinguishing confirmed product capabilities, capabilities pending verification, and functions that must be undertaken by third-party equipment.

Applicable industries

  • PV and Energy Storage

Primary user roles

  • Electrical Operations and Maintenance
  • Safety Management Personnel
  • Design Institute

Problems addressed

  • DC arcing and insulation degradation may not necessarily be detected through AC-side electrical parameters or ordinary protective devices.
  • Strings, combiner boxes, inverters, and DC switches come from different vendors, with complex monitoring interfaces and isolation boundaries.

Recommended product combination

WSR

WSR Insulation Resistance Online Tester

As a candidate product for insulation trend monitoring, the DC applicability, range, measurement method, and safety boundaries must be confirmed by the specific model.

FA

FA Arc Fault Detector

As a candidate product for arc monitoring, it must be confirmed whether it applies to the target DC object and corresponding model conditions; it cannot be used solely by series name.

FEXLINK

FEXLINK IoT Platform

Record pilot data, alarms, and review results; does not replace inverters or DC protection systems.

System architecture and data flow

PV DC-Side Arc and Insulation Monitoring System TopologyFour-layer data flow across perception, edge control, platform and application for PV DC-Side Arc and Insulation Monitoring.01Perception layer
Candidate monitoring products and third-party devices collect confirmed insulation or arc-related signals on…
02Edge / control layer
ESX aggregates approved monitoring data and executes basic rules.
03Platform layer
The platform records trends, events, and manual review results.
04Application layer
O&M personnel review anomalies according to the pilot plan, and handle them in coordination with inverter an…

Perception layer

Candidate monitoring products and third-party devices collect confirmed insulation or arc-related signals on the DC side.

Edge / control layer

ESX aggregates approved monitoring data and executes basic rules.

Platform layer

The platform records trends, events, and manual review results.

Application layer

O&M personnel review anomalies according to the pilot plan, and handle them in coordination with inverter and combiner box vendors.

Data flow

  1. On-site devices collect DC-side candidate signals.
  2. A confirmed interface sends data into ESX.
  3. The platform records events, trends, and labels.
  4. A pilot conclusion is formed after manual review.

Integration and interfaces

  • String voltage, combiner box, inverter, DC switch, and grounding structure documentation must be provided.
  • The DC applicability, interface, and installation conditions of the specific WSR and FA models must be confirmed.
  • The pilot must include isolation measures, test methods, data labels, and vendor coordination.

Applicable standards

  • Applicable standards related to photovoltaic power generation systems, DC electrical safety, and arc monitoring; the specific version, certification, and test method are to be confirmed by the project.

Acceptance and delivery boundaries

Suggested acceptance dimensions

  • Freeze the pilot strings, device models, measurement points, and isolation method.
  • Verify the consistency of candidate product documentation with the actual DC object.
  • Record test events, platform data, and manual review results.
  • Output whether it is applicable, what third-party equipment is needed, and the subsequent verification plan.

Limitations and exclusions

  • Current documentation is insufficient to confirm that WSR and FA cover all PV DC arc and insulation scenarios.
  • Cannot promise identification rate, insulation early-warning effect, or incident prevention results that have not been verified through testing.
  • Monitoring equipment cannot replace inverter protection, DC switches, fuses, and module shutdown systems.

Operational value

  • Turn DC-side risk from conceptual discussion into a verifiable pilot.
  • Identify capability gaps in existing product documentation.
  • Provide a basis for subsequent selection of dedicated DC monitoring equipment.

Selection guidance

  • First confirm the DC applicability of WSR and FA; do not select directly based on AC operating conditions.
  • When model, certification, and test basis cannot be obtained, third-party equipment with explicit DC capability should be prioritized.
  • Determine the pilot scope by string and combiner structure, not starting from the entire site simultaneously.

Typical implementation patterns

  • A typical application method is to select a small number of representative strings and combiner circuits for documentation verification and controlled testing, first verifying the interface and data quality, then discussing scope expansion. This content does not constitute a statement that any actual PV project has been deployed.

Before retrofit → With the solution

Before retrofit

  • DC arcing and insulation degradation may not necessarily be detected through AC-side electrical parameters or ordinary protective devices.
  • Strings, combiner boxes, inverters, and DC switches come from different vendors, with complex monitoring interfaces and isolation boundaries.

With the solution

  • Turn DC-side risk from conceptual discussion into a verifiable pilot.
  • Identify capability gaps in existing product documentation.
  • Provide a basis for subsequent selection of dedicated DC monitoring equipment.

How to evaluate the effect

01

Measurable signal

Candidate monitoring products and third-party devices collect confirmed insulation or ar…

02

Data source

WSR Insulation Resistance Online Tester · FA Arc Fault Detector

03

Review method

Freeze the pilot strings, device models, measurement points, and isolation method.

04

Acceptance boundary

Current documentation is insufficient to confirm that WSR and FA cover all PV DC arc and insulation scenarios.

Frequently asked questions

Is WSR necessarily applicable to PV DC systems?

Cannot be determined directly. The specific model, DC voltage, measurement method, range, and safety boundaries must be verified.

Can FA identify PV DC arcs?

Current documentation is insufficient for a unified confirmation; it should be verified by specific model and DC object.

Can this solution replace inverter protection?

No. Inverters, DC switches, and module protection each undertake different safety functions.

Why is only a pilot recommended?

Product applicability and acceptance methods in DC scenarios are not yet closed; a pilot can first identify capability gaps and interface risks.

Which vendors are needed for cooperation?

Usually inverter, combiner box, or DC monitoring equipment vendors are needed to provide interface, data, and test support.

Request a matched product combination and project review

Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.

Contact FEXLINK