Sub-metering and energy cost allocation should first define the allocation objects, meter locations, multipliers, statistical periods and the relationship to the main meter, then select DDSU1589, ZSA-31331 or confirmed ZSD/ZSA models, aggregate through CW and build sub-metering, reconciliation and anomaly records in FEXLINK. The platform organizes the data; allocation rules and final cost responsibility remain with the managing party.
The solution focuses on correct metering boundaries, reconcilable data and traceable rules, so that a site does not end up with sub-meters but no main-meter comparison or anomaly handling.
Used for sub-metering or tenant circuits suited to single-phase metering; specific functions are confirmed by model
Used for circuits that need three-phase energy and electrical parameters; accuracy and capabilities are confirmed against the datasheet
Aggregates meters and uploads data, performing field protocol conversion and buffering
Organizes metering points, sub-metering, reports, reconciliation and anomaly records
Used for DIN-rail three-phase sub-metering where the project requires it; model functions are confirmed item by item
Supplements other three-phase metering models per project and is not used interchangeably with ZSA-31331 in documentation
DDSU1589, ZSA-31331, ZSD and other meters cover the different sub-metering points.
CW aggregates meter data and handles field communication.
FEXLINK establishes the relationships between the main meter, sub-meters, areas and tenants.
Energy and management staff reconcile data by period and handle anomalies.
DDSU1589, ZSA-31331, ZSD and other meters cover the different sub-metering points.
DDSU1589 Single-Phase Electronic Energy Meter · ZSA-31331 Smart Distribution Box (Single/Three-Phase Metering)
Main meter, sub-meters and allocation objects are mapped completely
Sub-metering cannot automatically determine cost responsibility or allocation rules
Line losses, unmetered loads and measurement differences usually exist. Retain the difference and explain the cause rather than forcing the figures to match.
By mounting format, three-phase parameters, communication and functional requirements; specific capabilities are confirmed against the model datasheet.
Check whether old and new meter protocols and multipliers are compatible; otherwise the platform may not acquire data correctly.
Record the old meter closing reading, the new meter opening reading, the replacement time and the backfill rule, and keep the audit trace.
Rule changes should be versioned and authorized; ordinary users must not be able to overwrite historical definitions.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.