ESA Smart Meter (40+ Electrical Parameters)
Acquires circuit electrical parameters for floors, tenants or common areas; the specific model is confirmed by circuit
Energy and electrical safety in commercial buildings should establish separate metering and alarm boundaries for floors, tenants and common areas. ESA handles confirmed electrical parameter acquisition, SFA can be used for multi-parameter circuit monitoring, ESF and EST cover residual current and temperature, and ESP can supplement where precision or sensitive areas require it. Data reaches FEXLINK through a project-confirmed gateway or interface, and the existing BA system should be commissioned against the point list and permissions.
The solution places energy transparency, residual current and temperature-rise alarms under a unified floor and tenant structure, with emphasis on cross-discipline permissions and site retrofit boundaries.
Acquires circuit electrical parameters for floors, tenants or common areas; the specific model is confirmed by circuit
Used on representative circuits that need multi-parameter measurement and control; functions and accuracy are confirmed by model
Acquires residual current and temperature data as a source for electrical fire hazard monitoring
Acquires confirmed cabinet, cable or node temperatures; probe and range are confirmed by model
Supplements N-PE neutral-to-earth voltage monitoring where precision or sensitive areas require it
Aggregates field data and connects to the platform; capacity and interfaces are confirmed per project
ESA, SFA, ESF and EST cover floors, tenants, common areas and key electrical nodes.
ESX aggregates data and runs local rules and buffering where required.
FEXLINK organizes data and permissions by floor, tenant and common area.
Property, energy and O&M staff handle consumption, alarms and maintenance tasks separately.
ESA, SFA, ESF and EST cover floors, tenants, common areas and key electrical nodes.
ESA Smart Meter (40+ Electrical Parameters) · SFA Multi-Parameter Electrical Controller
Floors, tenants, common areas and metering circuits correspond one-to-one
The solution does not replace the building fire system, BA control or tenant-internal protective devices
Sub-metering can start first, but where residual current, temperature rise or sensitive loads exist, safety monitoring points should be evaluated at the same time.
Property management, energy staff or a designated owner should maintain it. The platform controls access by permission, and tenants should not by default change metering boundaries themselves.
According to property rules and metering boundaries; the platform only provides traceable data and reporting conditions.
It can be implemented through project interfaces, but point lists, alarm direction, control authority and failure strategies must be defined.
It depends on cabinet structure, obstructions, installation distance and the specific model. The range must be confirmed by on-site testing.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.
Contact FEXLINK