Tenant energy supervision in an industrial park starts by defining ownership, O&M and metering boundaries. Meters such as DDSU1589 and ZSA-31331 are then selected by single-phase or three-phase supply and by direct or CT connection; CW aggregates the data and FEXLINK builds tenant, sub-metering and permission views. Billing rules, common-area allocation and dispute handling are business rules that must be defined before the system goes live.

Energy DataMetering Acquisition

Solution overview

The solution addresses multi-tenant, multi-energy and multi-operator sites. It focuses on meter ownership, tenant mapping, permission isolation and data reconciliation rather than simply adding a batch of meters.

Applicable industries

  • Industrial parks

Primary user roles

  • Energy managers
  • Electrical O&M
  • Business management

Problems addressed

  • Multiple tenants, multiple energy carriers and multiple operating entities
  • No clear correspondence between tenant meters, common areas and managing entities
  • Manual reading and allocation easily produce definition differences, and historical data is hard to trace

Recommended product combination

FEXLINK

FEXLINK IoT Platform

Builds tenant, building, circuit and energy carrier views and configures permissions and reports

System architecture and data flow

Industrial Park Energy Supervision and Tenant Metering System TopologyFour-layer data flow across perception, edge control, platform and application for Industrial Park Energy Supervision and Tenant Metering.01Perception layer
DDSU1589, ZSA-31331 and other meters cover tenants, common areas and key sub-metering points.
02Edge / control layer
CW aggregates data from these meters and from third-party meters.
03Platform layer
FEXLINK builds tenant, area, meter and energy account structures.
04Application layer
Park management, property management and tenants view data and reports according to their permissions.

Perception layer

DDSU1589, ZSA-31331 and other meters cover tenants, common areas and key sub-metering points.

Edge / control layer

CW aggregates data from these meters and from third-party meters.

Platform layer

FEXLINK builds tenant, area, meter and energy account structures.

Application layer

Park management, property management and tenants view data and reports according to their permissions.

Data flow

  1. Establish tenant, ownership and metering boundaries
  2. Field meters acquire consumption or sub-metering data
  3. CW aggregates and uploads meter data
  4. FEXLINK builds tenant, sub-metering and common-area reports
  5. Management staff reconcile anomalies and allocation results

Integration and interfaces

  • Third-party water, gas and heat meters must provide protocol, multiplier and units
  • A unique mapping must be established between meters and tenant, room or enterprise codes
  • When connecting to a billing system, agree the data period, billing period and reversal process first

Applicable standards

  • Applicable energy metering and communication standards are confirmed by meter model and project
  • Protocol capabilities such as DL/T645 and Modbus follow the specific meter documentation
  • Common-area allocation and billing rules are fixed after confirmation by the park management

Acceptance and delivery boundaries

Suggested acceptance dimensions

  • Tenant, area, meter and circuit mappings are unique and traceable
  • Meter multipliers, units and data periods are verified
  • Tenant, property management and management permissions are isolated from each other
  • Anomalies, meter replacement and data backfill have audit records
  • Differences between tenant totals and the main meter can be explained
  • Data can be exported and reviewed before billing

Limitations and exclusions

  • The solution cannot replace the park billing system, leasing rules or financial reconciliation responsibility
  • With incomplete meter mapping, accurate attribution to a specific tenant cannot be committed
  • Common-area allocation involves management rules and cannot be inferred automatically by the platform

Operational value

  • Reduces manual meter reading and cross-meter consolidation
  • Improves traceability of tenant and common-area energy data
  • Provides records for abnormal consumption, meter replacement and data disputes

Selection guidance

  • Determine single-phase or three-phase supply, current rating and whether CT connection is used
  • Plan common-area and tenant meters separately so that later allocation remains explainable
  • Where remote switching is required, select a product with the corresponding capability and complete an authorization design

Typical implementation patterns

  • A typical implementation pattern first organizes meters by tenant and common area, then connects them to the platform and establishes a reconciliation process. The pattern contains no specific park, tenant names, fees or settlement records.

Before retrofit → With the solution

Before retrofit

  • Multiple tenants, multiple energy carriers and multiple operating entities
  • No clear correspondence between tenant meters, common areas and managing entities
  • Manual reading and allocation easily produce definition differences, and historical data is hard to trace

With the solution

  • Reduces manual meter reading and cross-meter consolidation
  • Improves traceability of tenant and common-area energy data
  • Provides records for abnormal consumption, meter replacement and data disputes

How to evaluate the effect

01

Measurable signal

DDSU1589, ZSA-31331 and other meters cover tenants, common areas and key sub-metering po…

02

Data source

DDSU1589 Single-Phase Electronic Energy Meter · ZSA-31331 Smart Distribution Box (Single/Three-Phase Metering)

03

Review method

Tenant, area, meter and circuit mappings are unique and traceable

04

Acceptance boundary

The solution cannot replace the park billing system, leasing rules or financial reconciliation responsibility

Frequently asked questions

How are single-phase and three-phase meters selected?

By the supply system, current rating and connection method of the tenant or circuit. They cannot be configured uniformly by application name.

How is common-area consumption allocated?

The managing party confirms the allocation rule and boundary first, then the platform calculates according to the rule. It is not inferred automatically.

How is historical data kept continuous after a meter replacement?

Record the replacement time, the old meter closing reading and the new meter opening reading, and handle them through the platform or reconciliation process.

Can tenants see other tenants' data?

No. Roles and data permissions should be configured to isolate by park, building or account.

Can water and gas meters be connected?

Yes, through third-party meter protocols, after confirming interfaces, units, multipliers and data quality.

Request a matched product combination and project review

Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.

Contact FEXLINK