DDSU1589 Single-Phase Electronic Energy Meter
Used for tenant or sub-metering circuits suited to single-phase metering; communication and tariff capabilities are confirmed by model
Tenant energy supervision in an industrial park starts by defining ownership, O&M and metering boundaries. Meters such as DDSU1589 and ZSA-31331 are then selected by single-phase or three-phase supply and by direct or CT connection; CW aggregates the data and FEXLINK builds tenant, sub-metering and permission views. Billing rules, common-area allocation and dispute handling are business rules that must be defined before the system goes live.
The solution addresses multi-tenant, multi-energy and multi-operator sites. It focuses on meter ownership, tenant mapping, permission isolation and data reconciliation rather than simply adding a batch of meters.
Used for tenant or sub-metering circuits suited to single-phase metering; communication and tariff capabilities are confirmed by model
Used for circuits that need three-phase electrical parameters and energy data; specific functions are confirmed by model
Aggregates meter data and uploads it, supporting field protocols confirmed by the project
Builds tenant, building, circuit and energy carrier views and configures permissions and reports
Supplements other three-phase or panel-mount metering models where the project requires; functions are confirmed per model
DDSU1589, ZSA-31331 and other meters cover tenants, common areas and key sub-metering points.
CW aggregates data from these meters and from third-party meters.
FEXLINK builds tenant, area, meter and energy account structures.
Park management, property management and tenants view data and reports according to their permissions.
DDSU1589, ZSA-31331 and other meters cover tenants, common areas and key sub-metering po…
DDSU1589 Single-Phase Electronic Energy Meter · ZSA-31331 Smart Distribution Box (Single/Three-Phase Metering)
Tenant, area, meter and circuit mappings are unique and traceable
The solution cannot replace the park billing system, leasing rules or financial reconciliation responsibility
By the supply system, current rating and connection method of the tenant or circuit. They cannot be configured uniformly by application name.
The managing party confirms the allocation rule and boundary first, then the platform calculates according to the rule. It is not inferred automatically.
Record the replacement time, the old meter closing reading and the new meter opening reading, and handle them through the platform or reconciliation process.
No. Roles and data permissions should be configured to isolate by park, building or account.
Yes, through third-party meter protocols, after confirming interfaces, units, multipliers and data quality.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.
Contact FEXLINK