FECB2P Smart Circuit Breaker (Load Switching & Metering)
Candidate load switching and metering component; capability and authorized scope are confirmed by model
Demand response execution must distinguish three modes: monitoring, prompting and actual control. FECB2P and FECM2 can provide confirmed load control and aggregation capability, CW handles field aggregation, and FEXLINK records commands, execution, baselines, actual load and anomalies. Control actions require authorization, safety interlocks and fallback testing, and effect verification must also exclude production changes and equipment anomalies.
The solution focuses on the evidence chain between command and response, not on showing a single power curve.
Candidate load switching and metering component; capability and authorized scope are confirmed by model
Aggregates multi-circuit data and connects the control chain; interfaces and capacity are confirmed by model
Aggregates field data and runs project-confirmed edge rules
Records commands, execution, load changes, alarms and effect verification
ESA or confirmed metering data reflects the participating loads and the baseline.
CW and FECM2 handle field data, and FECB2P switches loads within the authorized scope.
FEXLINK builds command, execution and verification records.
Operations and O&M staff review response completion and anomalies.
ESA or confirmed metering data reflects the participating loads and the baseline.
FECB2P Smart Circuit Breaker (Load Switching & Metering) · FECM2 Multi-Loop Smart Breaker Data Aggregator
Participating resources, devices and circuits are mapped completely
No fixed response volume, completion rate or revenue can be committed
According to the applicable project rules, historical load and comparable operating conditions, with records of any anomaly adjustments.
Compare command time, device status and actual load, and record network, protection or manual intervention causes.
Only after devices, authority, interlocks and fallback have passed review. By default, simulation or manual confirmation comes first.
Use the baseline, actual load and event records for the same boundary and period, excluding production and environmental changes.
Fire, safety and critical process loads that must not be interrupted should not be included, and the control strategy must be explicitly constrained.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.