Virtual power plant resource aggregation starts by building a register of account numbers, devices, adjustable capacity, baselines, communication and control authority. ESA provides confirmed circuit metering, FECB2P and FECM2 serve as candidate load control and aggregation components, CW aggregates external data, and FEXLINK organizes resources and events. Electricity market rules, response capability, settlement and automatic control must be verified item by item in the project and pilot.
The solution provides a resource registration and data aggregation framework. It does not present a candidate product combination as existing market trading or automatic response capability.
Acquires electrical parameters on adjustable resources or key circuits
Candidate load switching and metering component; capabilities are confirmed by model
Candidate multi-circuit data aggregation component; interfaces and capacity are confirmed by model
Aggregates field data and connects project-confirmed third-party interfaces
Builds the resource register, permissions, baselines and response records
ESA and confirmed device interfaces acquire resource consumption and status.
CW aggregates data. The control capability of FECB2P and FECM2 is determined by the pilot and device conditions.
FEXLINK maintains resources, baselines, commands and response records.
Operations staff review resources and response results according to permissions.
ESA and confirmed device interfaces acquire resource consumption and status.
ESA Smart Meter (40+ Electrical Parameters) · FECB2P Smart Circuit Breaker (Load Switching & Metering)
Resource register, account numbers, devices and control authority are complete
The solution is not used to confirm market access, response revenue or settlement results
No. The platform is a resource management and data tool; market rules, device control, authorization and operating processes are also required.
Combine the rated device capability, actual load, permitted interruption time, control method and site metering verification.
Market interfaces, control authority, safety interlocks and a pilot must be completed first. Fully automatic operation is not recommended by default.
The resource owner and the operating entity authorize it per project requirements, and the platform controls access by permission.
The specific model, circuit and protection conditions must be confirmed, and the control strategy must pass electrical and safety review.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.