Maximum demand management requires confirming the demand period used for grid settlement, the tariff rules and the adjustable load boundary first. ESA then provides electrical parameters on the relevant circuits, FECB2P and FECM2 serve as candidate control and aggregation components, and CW aggregates the data. Any remote switching must include permissions, safety interlocks and manual fallback, and must not bypass existing protection.
The solution separates demand monitoring, load control and safety authority by design, and emphasizes that control actions require dedicated confirmation.
Acquires electrical parameters on the main incomer and key load circuits for demand analysis
Candidate load switching and metering component; current, communication and protection parameters are confirmed by model
Aggregates data from multiple circuit breakers; actual interfaces and capacity are confirmed by model
Aggregates field devices and uploads data, running confirmed edge rules
Builds demand trends, control records, permissions and alarms
ESA monitors the main incomer and key loads; FECB2P and FECM2 provide confirmed load status or switching capability.
CW performs data aggregation and authorized rules. It does not carry mandatory protection by default.
FEXLINK builds demand, load, control and response records.
Energy staff review peak-shaving strategies; O&M staff handle alarms and fallback.
ESA monitors the main incomer and key loads;FECB2P and FECM2 provide confirmed load stat…
ESA Smart Meter (40+ Electrical Parameters) · FECB2P Smart Circuit Breaker (Load Switching & Metering)
The demand period and metering points match the project rules
No fixed peak-shaving volume, cost saving or revenue can be committed
No. Fire protection, safety, critical process and non-interruptible loads must be excluded, and management authorization obtained.
According to the local grid and project rules. The platform configuration must match the settlement period.
It requires confirmed FECB2P or FECM2 capability and an electrical design, plus permissions, interlocks and fallback. Monitoring and prompting are preferred by default.
Compare the same-period baseline, actual load and control records, while excluding production changes and abnormal downtime.
Local protection, manual fallback and alarm records must be retained. Platform control must not be the only safety measure.