CW Edge Computing Gateway
Handles field acquisition, protocol conversion, local rules and necessary alarm upload; control capability is confirmed by model
Local thresholds and interlock control should first clarify the layered relationship between monitoring alarms and safety protection. CW or a controller can execute acquisition, rules and I/O interlocking, CC100 can handle local logic, and HMI supports on-site viewing and operation; but emergency stop, fire protection, machinery safety and critical interlocks must be handled by independent hard protection and safety circuits that meet project requirements. Software control cannot replace safety assessment, and must not act directly before loads and de-energized states are confirmed.
The solution targets sites that need fast local response and cannot depend on a cloud round trip. It focuses on alarm strategy, control logic, fail-safe behaviour, manual reset, operating authority and the division of responsibility with upper-level platforms.
Handles field acquisition, protocol conversion, local rules and necessary alarm upload; control capability is confirmed by model
Handles project-confirmed local logic control and device interlocking; I/O and performance specifications are confirmed by specific model and technical documentation
Expands digital, analog, relay or temperature inputs and outputs as the project requires; point count, isolation and accuracy are confirmed by specific module
Provides on-site status display, alarm acknowledgement and a controlled operation entry point; interface and protection rating are confirmed by model
Used for centralized monitoring, alarm records and remote O&M; it does not replace local hard protection
Sensors, instruments and device status enter the local control layer through DI, analog inputs, RS485 or other project-confirmed interfaces
CC100 or CW executes project-confirmed thresholds, logic, delays, interlocks and outputs; critical safety circuits have independent protection
FEXLINK receives alarms, status and operation records for centralized monitoring and traceability
On-site staff view status and perform controlled resets through the HMI, while management reviews alarms and response results on the platform
Sensors, instruments and device status enter the local control layer through DI, analog…
CW Edge Computing Gateway · CC100 PLC Local Controller
Verify input, threshold, delay, output and reset behaviour item by item against the control logic table, and record test results
The software and gateway capabilities in this solution do not replace independent safety circuits such as emergency stop, fire protection or machinery guarding
It depends on the controller, gateway and deployment. If the logic runs locally and power is available, it can usually continue; local rules, storage and standalone operation must be confirmed during selection.
Only where contact rating, load type, electrical isolation and protection design all meet requirements. Critical equipment should be switched by a compliant control and protection circuit, not judged from a low-voltage output alone.
Emergency stop and safety interlocks should be implemented by safety circuits that meet project safety requirements. A PLC can read the status for monitoring, but ordinary software logic cannot replace the independent safety function.
They can be opened by permission, but critical thresholds should be controlled by role and approval. Changes should record the operator, time, old value and new value.
It depends on risk. Interlocks with high risk or potential equipment damage usually require manual confirmation, while informational alarms can reset automatically per project rules.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.
Contact FEXLINK