Home / Solutions / Dry-Contact State Aggregation for Existing SPDs

Dry-Contact State Aggregation for Existing SPDs

Dry-contact state aggregation for existing SPDs applies to SPD circuits with available telemetry outputs. Models such as ZL1, ZL2 and ZL5 that have telemetry capability can provide switching states; ESI completes dry-contact acquisition, then integrates with the platform through project-confirmed CW, FG or an existing gateway. This scheme can only reflect the state corresponding to the telemetry definition, and cannot be used to read SPD leakage current, temperature, remaining life or lightning current parameters; contact voltage, isolation and polarity must be verified before wiring.

Lightning Protection & GroundingSPD StatusDigital Input Acquisition

Solution overview

This is a low-modification state-digitization scheme, focusing on integrating existing telemetry into the unified platform rather than adding new sensing capability to all existing SPDs.

Applicable industries

  • Industrial and Commercial Power Distribution

Primary user roles

  • Lightning Protection Engineer
  • Automation Engineer
  • System Integrator

Problems addressed

  • Existing SPDs have only dry contacts and cannot directly provide digital communication.
  • Telemetry definitions, NO/NC logic, contact capacity and isolation conditions differ among SPDs, easily causing state-mapping errors.

Recommended product combination

ESI

ESI Digital Status Monitor

Acquires dry-contact states and integrates with the upper-level gateway or platform according to on-site configuration.

System architecture and data flow

Dry-Contact State Aggregation for Existing SPDs System TopologyFour-layer data flow across perception, edge control, platform and application for Dry-Contact State Aggregation for Existing SPDs.01Perception layer
SPDs with telemetry capability in the ZL series output switching states, and ESI acquires the dry contacts.
02Edge / control layer
CW or a project-confirmed gateway completes data aggregation and uplink.
03Platform layer
FEXLINK maps devices, circuits, telemetry states and alarms.
04Application layer
O&M personnel view telemetry changes by SPD circuit and arrange inspection according to handling rules.

Perception layer

SPDs with telemetry capability in the ZL series output switching states, and ESI acquires the dry contacts.

Edge / control layer

CW or a project-confirmed gateway completes data aggregation and uplink.

Platform layer

FEXLINK maps devices, circuits, telemetry states and alarms.

Application layer

O&M personnel view telemetry changes by SPD circuit and arrange inspection according to handling rules.

Data flow

  1. The SPD telemetry contact outputs a state.
  2. ESI completes switching-quantity acquisition.
  3. The gateway uploads the state to the platform.
  4. The platform forms state changes, alarms and handling records.

Integration and interfaces

  • The SPD telemetry type, NO/NC logic, contact capacity and common-terminal wiring must be confirmed.
  • Verify the ESI input voltage, isolation method, power supply and number of channels.
  • If platform points already exist, reuse the existing coding rules and avoid duplicate point creation.

Applicable standards

  • GB 50057, GB 50343 and SPD condition monitoring requirements applicable to the project; specific versions and telemetry-interface requirements are confirmed by the project.

Acceptance and delivery boundaries

Suggested acceptance dimensions

  • Verify the SPD model, telemetry logic and platform point definition device by device.
  • Verify state changes and alarm records through manual triggering or safe simulation.
  • Check the ESI contact voltage, isolation and communication state.
  • Deliver telemetry point tables, wiring diagrams and platform configuration records.

Limitations and exclusions

  • Not applicable to SPDs without telemetry outputs and that cannot have external sensors added.
  • The specific degradation degree or remaining life of an SPD cannot be inferred from the dry-contact state.
  • When the contact voltage exceeds the ESI allowable range, add isolation or switch to an adapted scheme.

Operational value

  • Brings scattered SPD telemetry into the unified platform.
  • Reduces the wiring and retrofit cost of digitizing old devices.
  • Forms historical records of SPD state changes.

Selection guidance

  • Only SPDs with available telemetry outputs are suitable for this scheme.
  • When channels are concentrated, select ESI; structured cabling and device integration are configured according to connection distance, power supply and communication conditions.
  • When lightning-current or leakage-current data is needed, separately select products with corresponding capabilities such as FL, FS or ESM.

Typical implementation patterns

  • A typical implementation pattern is to retain the original SPDs in existing distribution cabinets and only integrate their telemetry dry contacts into ESI by circuit, mapping to the platform through a gateway. This pattern only describes the interface relationship and does not represent that deployment has been completed for a particular customer.

Before retrofit → With the solution

Before retrofit

  • Existing SPDs have only dry contacts and cannot directly provide digital communication.
  • Telemetry definitions, NO/NC logic, contact capacity and isolation conditions differ among SPDs, easily causing state-mapping errors.

With the solution

  • Brings scattered SPD telemetry into the unified platform.
  • Reduces the wiring and retrofit cost of digitizing old devices.
  • Forms historical records of SPD state changes.

How to evaluate the effect

01

Measurable signal

SPDs with telemetry capability in the ZL series output switching states, and ESI acquire…

02

Data source

ZL1 Type 2 Surge Protective Device (Class II SPD) · ZL2 Type 2 Plug-in Surge Protective Device · ZL5 40kA Multi-Pulse Surge Protective Device with Backup Protector · ESI Digital Status Monitor

03

Review method

Verify the SPD model, telemetry logic and platform point definition device by device.

04

Acceptance boundary

Not applicable to SPDs without telemetry outputs and that cannot have external sensors added.

Frequently asked questions

What information can a dry contact reflect about an SPD?

It can only reflect the state defined by that contact, such as fault or alarm. Leakage current, temperature, service life or lightning-current data cannot be obtained automatically.

Do ZL1, ZL2 and ZL5 all definitely have telemetry?

Not necessarily. Whether they have telemetry output should be confirmed by the specific model and order configuration.

Can ESI acquire active voltage signals?

ESI is positioned for dry-contact acquisition. Before integrating active signals, the input specification and isolation requirements must be verified.

How to avoid NO/NC mapping errors?

Establish a telemetry logic table before construction, and simulate and verify the platform state point by point under safe conditions.

Is ESI still needed when a PLC already exists?

If the existing PLC has sufficient channels, isolation and point-table permission, direct integration can be evaluated; ESI applies to scenarios that need independent aggregation or supplementary channels.

Request a matched product combination and project review

Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.

Contact FEXLINK