Three-stage SPD and backup protection monitoring should establish points separately for the main distribution, sub-distribution and end equipment, and select FS and FSS according to existing or new circuits, aggregating to the platform via FG. The page focuses not on comparing individual SPDs, but on verifying whether protection states at each stage are correlatable, traceable and able to support tiered maintenance.

Lightning Protection & GroundingSPD Status

Solution overview

This solution addresses the scattered lightning-protection states of main, distribution and end cabinets by establishing a tiered inventory and aggregation chain. When FSS is selected, protection parameters shall be verified circuit by circuit; when FS is selected, only the state interfaces the model can provide shall be used.

Applicable industries

  • Industrial and Commercial Power Distribution

Primary user roles

  • Lightning Protection Engineer
  • Electrical Operations and Maintenance
  • Project Integrator

Problems addressed

  • The SPD states of the main, distribution and end cabinets are scattered among themselves, and a single-point alarm cannot indicate which stage of the protection chain has changed.
  • The definitions of backup protection, SPD body state and lightning events are inconsistent, easily leading to repeated troubleshooting during maintenance.

Recommended product combination

FS

FS SPD Monitoring Module

Used to collect telemetry signals, circuit breaker, grounding or lightning strike count states from existing SPDs; specific capabilities, power supply and communication suffixes are to be confirmed by the FS model.

FEXLINK

FEXLINK IoT Platform

Provides device management, alarm, historical data, permission and O&M record capabilities; the deployment method is to be confirmed by the project.

System architecture and data flow

Three-Stage SPD and Backup Protection Monitoring for Distribution Cabinets System TopologyFour-layer data flow across perception, edge control, platform and application for Three-Stage SPD and Backup Protection Monitoring for Distribution Cabinets.01Perception layer
Configure FS state acquisition or FSS integrated smart SPD at the tiers of main distribution, sub-distributi…
02Edge / control layer
FG aggregates devices by distribution area and establishes naming rules by cabinet number, tier and circuit.
03Platform layer
FEXLINK displays alarms, historical events and handling status by main, distribution and end cabinets.
04Application layer
O&M personnel first determine the tier of the anomaly, then enter the corresponding distribution area for ve…

Perception layer

Configure FS state acquisition or FSS integrated smart SPD at the tiers of main distribution, sub-distribution and end circuits, retaining tiered points.

Edge / control layer

FG aggregates devices by distribution area and establishes naming rules by cabinet number, tier and circuit.

Platform layer

FEXLINK displays alarms, historical events and handling status by main, distribution and end cabinets.

Application layer

O&M personnel first determine the tier of the anomaly, then enter the corresponding distribution area for verification, avoiding repeated cross-tier checks.

Data flow

  1. SPDs and backup protection at each stage produce states or events.
  2. FS or FSS collects the corresponding circuit information.
  3. FG aggregates to the platform with a tiered point list.
  4. The platform forms alarms and maintenance tasks by protection tier.

Integration and interfaces

  • For new circuits, prioritize confirming FSS pole count, protection parameters and installation space during the protection scheme stage.
  • Existing circuits require verification of SPD telemetry signals, circuit breaker auxiliary contacts and backup protection interfaces.
  • When integrating with a power monitoring or O&M system, use the unique code of each tier as the basis for data association.

Applicable standards

  • GB 50057 Design Code for Lightning Protection of Buildings (applicable clauses and version to be confirmed by the project location and design documents)
  • GB/T 18802 series of standards for low-voltage surge protective devices (test category, model and version to be confirmed by the project)

Acceptance and delivery boundaries

Suggested acceptance dimensions

  • The SPD points of the main, distribution and end cabinets can be uniquely corresponded and reflect the tier.
  • Backup protection state and SPD state are recorded separately and are not merged into one item in the data model.
  • An alarm at any tier can be traced to occurrence time, device location and subsequent handling.

Limitations and exclusions

  • The specific parameters, coordination distances and protection selectivity of the three-stage SPD must be confirmed by the design documents.
  • Without a tiered inventory and circuit correspondence, automatic localization of an anomaly to a particular SPD cannot be promised.
  • A platform alarm is not equivalent to having completed on-site insulation, grounding or protector performance testing.

Operational value

  • Converts the inspection target of tiered lightning protection from a device list into a localizable protection chain.
  • Narrows the scope for judging main, distribution or end circuits after an anomaly appears.
  • Provides a unified state recording method for new and existing circuits.

Selection guidance

  • For new or fully replaced circuits, prioritize evaluating FSS, and select by In, Imax, Up, number of poles and short-circuit conditions.
  • For existing circuits, select FS after confirming the connectable telemetry signals and auxiliary contacts.
  • When backup protection signals are absent, SPD state must not be directly equated with backup protection having operated.

Typical implementation patterns

  • A typical implementation pattern is to first establish a three-tier inventory of main, distribution and end cabinets, then integrate in phases according to power outage and restoration windows.
  • Another pattern is to use integrated smart SPDs in new circuits while retaining independent state acquisition for existing circuits.

Before retrofit → With the solution

Before retrofit

  • The SPD states of the main, distribution and end cabinets are scattered among themselves, and a single-point alarm cannot indicate which stage of the protection chain has changed.
  • The definitions of backup protection, SPD body state and lightning events are inconsistent, easily leading to repeated troubleshooting during maintenance.

With the solution

  • Converts the inspection target of tiered lightning protection from a device list into a localizable protection chain.
  • Narrows the scope for judging main, distribution or end circuits after an anomaly appears.
  • Provides a unified state recording method for new and existing circuits.

How to evaluate the effect

01

Measurable signal

Configure FS state acquisition or FSS integrated smart SPD at the tiers of main distribu…

02

Data source

FS SPD Monitoring Module · FG Smart Gateway (Zigbee, RS485 & Ethernet)

03

Review method

The SPD points of the main, distribution and end cabinets can be uniquely corresponded and reflect the tier.

04

Acceptance boundary

The specific parameters, coordination distances and protection selectivity of the three-stage SPD must be confirmed by the design documents.

Frequently asked questions

Must the three-stage SPD use the same product?

No. FSS or FS should be selected separately according to new or existing status, protection parameters, interfaces and in-cabinet space, and the platform manages them uniformly with tiered points.

Can backup protection state be replaced by SPD telemetry signals?

Not directly. The two monitor different objects and must be defined separately in the point list and device interfaces.

Can only one master alarm be set per power distribution room?

Technically it can be aggregated, but losing tiered information is not recommended; at minimum, the cabinet tier and device tier should be retained for localization.

What devices does "three-stage SPD and backup protection monitoring for distribution cabinets" typically consist of?

FS: collects telemetry signals, circuit breaker, grounding or lightning strike count states from existing SPDs; specific capabilities, power supply and communication suffixes are confirmed by the FS model; FG: aggregates downstream lightning-protection monitoring devices, performs protocol conversion and transmits states and events to the upper-level platform; FEXLINK: provides device management, alarm, historical data, permission and O&M record capabilities, with the deployment method confirmed by the project; FSS: as an integrated smart SPD combining protection and condition monitoring, selected by number of poles, protection parameters and circuit conditions.

What site conditions should be verified before implementing "three-stage SPD and backup protection monitoring for distribution cabinets"?

For new or fully replaced circuits, prioritize evaluating FSS, and select by In, Imax, Up, number of poles and short-circuit conditions; for existing circuits, select FS after confirming the connectable telemetry signals and auxiliary contacts; when backup protection signals are absent, SPD state must not be directly equated with backup protection having operated.

Request a matched product combination and project review

Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.

Contact FEXLINK