Home / Solutions / Switchgear Switch and MCB Status Monitoring

Switchgear Switch and MCB Status Monitoring

The core of switchgear switch and MCB status monitoring is to connect the available auxiliary contacts, MCB status contacts and cabinet door contacts to ESI, then aggregate them through ESX into FEXLINK to build status-change, alarm and response records. Contact type, voltage level, isolation method and DI count must be confirmed on site first; general digital input monitoring must not be extended into current or temperature monitoring.

Electrical HazardsDigital Input Acquisition

Solution overview

The solution suits switchgear retrofits that already have dry contacts but lack remote status records. It focuses on contact wiring, status mapping, event timing and the management loop, and does not change existing breaker protection.

Applicable industries

  • Industrial and commercial power distribution

Primary user roles

  • Electrical O&M
  • Distribution design
  • System integrators

Problems addressed

  • Switch open/close, MCB tripping and cabinet door status still depend on manual confirmation, with no traceable digital input records
  • Status information from different switchgear lacks unified point naming
  • After an alarm, the operating sequence and response process are hard to verify

Recommended product combination

ESI

ESI Digital Status Monitor

Acquires dry contact status from switches, MCBs, cabinet doors or third-party equipment; DI count and contact conditions are confirmed by model

FEXLINK

FEXLINK IoT Platform

Displays cabinet, circuit, point, status-change and alarm response records

System architecture and data flow

Switchgear Switch and MCB Status Monitoring System TopologyFour-layer data flow across perception, edge control, platform and application for Switchgear Switch and MCB Status Monitoring.01Perception layer
Breaker auxiliary contacts, MCB status contacts and cabinet door contacts are wired to ESI.
02Edge / control layer
ESX aggregates digital inputs by cabinet and circuit. It does not operate the breakers directly.
03Platform layer
FEXLINK maintains the device-to-point mapping and displays status and events.
04Application layer
O&M staff review exceptions by cabinet, circuit and area, and complete alarm acknowledgement and inspection…

Perception layer

Breaker auxiliary contacts, MCB status contacts and cabinet door contacts are wired to ESI.

Edge / control layer

ESX aggregates digital inputs by cabinet and circuit. It does not operate the breakers directly.

Platform layer

FEXLINK maintains the device-to-point mapping and displays status and events.

Application layer

O&M staff review exceptions by cabinet, circuit and area, and complete alarm acknowledgement and inspection records.

Data flow

  1. Field dry contacts produce open/close or alarm status
  2. ESI acquires and records digital input changes
  3. ESX aggregates data from multiple cabinets and uploads it
  4. FEXLINK maps events to cabinet, circuit and responsible person

Integration and interfaces

  • Dry contact voltage, common terminal arrangement and isolation requirements must be confirmed before wiring
  • Multiple ESI units can connect to ESX over RS485 or another fieldbus confirmed by the project
  • When connecting to an existing system, provide the point list and status dictionary first, then agree the interface direction

Applicable standards

  • Applicability for LV distribution equipment and control circuits is confirmed against project design documents
  • Versions, addresses and point lists for field protocols such as Modbus are frozen before implementation
  • Cabinet retrofit and secondary wiring should meet the electrical installation requirements of the project location

Acceptance and delivery boundaries

Suggested acceptance dimensions

  • Every digital input maps to a unique cabinet, circuit and status meaning
  • Contact voltage, common terminal and isolation method are verified on site
  • Status-change times, alarms and acknowledgement records are traceable
  • Status anomalies after a gateway disconnection are detected and recovered
  • Monitoring wiring does not affect the operation of existing breakers and protection circuits

Limitations and exclusions

  • This solution acquires dry contacts only and does not infer the internal cause of a breaker fault
  • Where an MCB has no usable auxiliary contact, retrofit feasibility must be confirmed first
  • Cabinet door status must not be treated as equipment operating status or power quality status

Operational value

  • Consolidates scattered cabinet door, MCB and switch status into one view
  • Reduces cabinet-by-cabinet manual checks and verbal handovers
  • Provides event records for trip review, inspection and retrofit acceptance

Selection guidance

  • Count dry contacts, contact types and cabinet distribution first, then determine the ESI specification
  • Where analog values, temperature or residual current are needed, add the corresponding products; a digital input module cannot substitute for them
  • For remote control, evaluate relays, contactors and operating authority separately

Typical implementation patterns

  • A typical implementation pattern collects auxiliary contacts, MCB status and cabinet door contacts centrally and establishes a cabinet-to-point mapping. It involves no specific customer; applicability depends on site contact conditions and the space available inside the cabinet.

Before retrofit → With the solution

Before retrofit

  • Switch open/close, MCB tripping and cabinet door status still depend on manual confirmation, with no traceable digital input records
  • Status information from different switchgear lacks unified point naming
  • After an alarm, the operating sequence and response process are hard to verify

With the solution

  • Consolidates scattered cabinet door, MCB and switch status into one view
  • Reduces cabinet-by-cabinet manual checks and verbal handovers
  • Provides event records for trip review, inspection and retrofit acceptance

How to evaluate the effect

01

Measurable signal

Breaker auxiliary contacts, MCB status contacts and cabinet door contacts are wired to E…

02

Data source

ESI Digital Status Monitor · ESX Smart Edge Computing Gateway

03

Review method

Every digital input maps to a unique cabinet, circuit and status meaning

04

Acceptance boundary

This solution acquires dry contacts only and does not infer the internal cause of a breaker fault

Frequently asked questions

Can a standard MCB be monitored?

It needs an MCB status auxiliary contact or a digital signal that can be safely connected. Without an auxiliary contact, the retrofit method should be evaluated separately.

Can ESI measure current directly?

No. ESI is used for dry contact status acquisition. Current, power and energy require a suitable electrical parameter monitoring product.

Is cabinet door status a safety alarm?

It can be treated as a status or management alarm, but the alarm level, delay and response responsibility must be configured according to site procedures.

How are multiple cabinets networked?

They can be grouped by cabinet and connected to ESX over a fieldbus. The specific bus, distance and address plan are confirmed by model and site conditions.

Does monitoring wiring require a power outage?

It depends on contact location and site safety measures. A shutdown window, isolation and voltage verification plan must be completed before installation.

Request a matched product combination and project review

Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.

Contact FEXLINK