Stadium LargeEvent Lightning Safety Online Monitoring

Beijing Winter Olympics Zhangjiakou Venue Lightning Protection Safety

UsingFSLightning Current Monitoring Monitor, FSS Smart SPD、FL Transient Current Monitor&FG Smart Gateway,toSports VenueVenueDistribution System&Lightning Protection Facilitiesto7×24HoursOnline Monitoring,Real-TimeSense Lightning Events、SPD Status& Lightning Protection SystemHealth,EnsureLarge EventsElectrical& Lightning Protection SystemStable Operation.

INDUSTRY

Stadium

CUSTOMER

A Sports VenueOperationEnterprise

CUSTOMER TYPE

LargeSportsEventVenueOperator

DEPLOYMENT

[TBD]

01 · BACKGROUND

Customer Background

Enterprise Type

A Sports VenueOperationEnterprise,Responsible toLargeSportsEventVenueofConstruction&Operation,UndertakesInternationalEvent AssuranceTask,Safe OperationStandardVery HighHigh.

Enterprise Scale: [TBD]

VenueScale

Sports VenueContainsMain Stadium、Training Hall、Auxiliary Service Facilities& OtherMulti-Venues,Distribution System Complex、Power Load Fluctuates Greatly,During Event Assurance PeriodtoPower SupplyReliabilityRequirements Very HighHigh.

VenueCount/Capacity:[TBD]

Industry Position

InternationalEventVenue,Need Strict ComplianceGB 50057 "Design Code to Protection of Buildings Against Lightning"&JGJ 352 "Electrical Design Code to Sports Buildings"& OtherStandard,Lightning SafetyisEvent AssuranceCore.

Compliance Standard: GB 50057 / JGJ 352

02 · CHALLENGES

Business Challenges

01

Mountain VenueLightning Frequent、Lightning Risk High

VenuePositiontoMountain Area,Lightning Days Multiple、Lightning Strike Intensity High,VenueMetal Roof&ElectricalSystemWithstand Direct Lightning&Induced LightningStrike Risk SignifiCant,During Event Assurance PeriodLightning EventMajor Impact.

02

SPD StatusWithoutOnline Monitoring、Hazards Hard to Sense

VenueDistribution CabinetSPD Long-Term Lightning Strike ShockDegradation Exists& Failure Risk,TraditionalSPD WithoutOnline MonitoringCapability,FaultAfterCannot&Warning,CanMay AffectEventPower SupplyReliability.

03

Event Assurance PeriodManual InspectionHigh Pressure

During Event Assurance PeriodNeedHigh-FrequencyInspectionDistribution Cabinet&Lightning Protection Facilities,Manual Inspection Labor Investment High、EfficiencyLimited,Hard to MeetEvent AssuranceofReal-Time Capability&Full-Cover Requirements.

04

Lightning EventLack CompleteDataRecord

Lightning EventAfterLack CompleteContinuityofLightning CurrentAmplitude、Polarity、WavetomData,Cannot SupportLightning Impact Assessment、Equipment Damage Analysis&Insurance Claim Evidence.

03 · SOLUTION

Solution

System Architecture Diagram

System Architecture Diagram Placeholder - To be replaced with real architecture diagram

Noe: The above is a placeholder image, to be replaced with a real system architecture diagram. The architecture diagram should show Sensing Layer(FS/FSS/FLand other terminals)→ Network Layer(FG Smart Gateway)→ Platform Layer(FEXLINK Cloud)three-layer structure.

Deployed Product List

Product Name Model Quantity Function
FSLightning Current Monitoring Monitor FS [TBD] Deployed atVenueLightning Rod Downlead,Real-Time Monitoring ofLightning CurrentAmplitude、Polarity、Wavetom,RecordLightning Event&TieredAlarm
FSS Smart SPD FSS [TBD] Deployed atVenueDistribution CabinetPower Inlet,Flagship Full-Parameter SPD, built-in 8 sensor groups, Real-Time Monitoring of SPD degradation and lightning events
FL Transient Current Monitor FL [TBD] Deployed atVenueKeyPowerCircuit,Monitor SPD Surge Discharge Current,AssessmentSPDOperation Count& Remaining Life
FG Smart Gateway FG [TBD] AggregationFS/FSS/FLand other terminalsData,Edge Processing, viaOptical Fiber/4GUploadCloud Platform
FEXLINK Cloud Platform Cloud 3.0 1 Set DataAggregation、VisualizationDisplay, Lightning Event Alarm、Compliance Report Auto Generation、Insurance Claim EvidenceSupport

Noe: Product quantities are TBD, actual deployment quantities will be determined based on Venuescale and monitoring point density, to be provided by the project implementation party.

Network Topology

Sensing Layer: FSLightning Current Monitoring Monitor Deployed atVenueLightning Rod DownleadPoint,FSS Smart SPDDeployed atVenueDistribution CabinetPower Inlet,FL Transient Current MonitorDeployed atKeyPowerCircuit SPD Downstream,CoverLightning Monitoring、SPD Monitoring、SurgeCurrent MonitoringThree MajorDimension.

Network Layer: Each sensing terminal connects via RS485 bus(Modbus-RTUProtocol)to nearby FG Smart Gateway,FG Gateway uploads via VenueOptical Fiber Private Network/4GCellular Network Uplink toVenueOperator CompanyInGrid Network,Key NodesPointSupportDual-Link Redundant Backup,Ensure During EventsDataTransmissionReliability.

Platform Layer: Data aggregates to FEXLINK Cloud Platform(PrivateDeployed atVenueDataCenter),ProvideWeb& MobileVisualizationDashboard、Lightning EventReal-Time Alarm、HistoryLightning Database、Compliance Report Auto Generation、Multi-Role Permission Management& Other Functions,SupportEvent AssuranceCommandCenterLarge Screen Display.

Integration Layer: Cloud PlatformThroughStandardREST API / Modbus TCPProtocol,&VenueExistingBASBuilding AutomationSystem、Security Command System、Event AssuranceCommandSystemIntegration,Achieve Lightning Event Linked Alarm& Emergency CommandCoordination.

04 · IMPLEMENTATION

Implementation Process

1

Site Survey & Solution Design

Engineers VisitVenueEach Venue Site to Survey,SurveyLightning Rod Layout、Distribution System Structure、SPDInstallationLocation,outputting point list and system deployment plan.

Cycle: [TBD]

2

Equipment Installation & Wiring

FSInstallationtoLightning Rod Downlead,FSS/FLInstalled at EachDistribution Cabinet,FG Smart Gateway Centralized Deployment,Complete RS485 Bus Wiring & Power Connection,StrictFollowEventVenueOperation Specifications.

Cycle: [TBD]

3

System Commissioning & Platform Integration

ConfigureFG GatewayacquiringParameters&Upload Transmission Cycle,CompleteFEXLINK Cloud PlatformAccount Setup、Point Binding、Lightning StrikeAlarm Threshold Setting、&Event AssuranceCommandSystemIntegrationCommissioning.

Cycle: [TBD]

4

Trial Operation & Personnel Training

System Trial Operation& Calibration Data Accuracy,toEvent AssuranceTeamto Platform Operation、Lightning Alarm Handling、Report Export、Emergency Linkage& Other Training,CompleteProject Acceptance & Delivery.

Cycle: [TBD]

05 · RESULTS

Application Effects

7×24h

All-Weather Online Monitoring

[TBD]

Monitoring Point Cover Count

[TBD]

Reduced Manual Inspection Hours

[TBD]

Lightning EventRecord Count

[TBD]

SPDDegradation Early Warning Count

100%

Lightning EventCanTraceability Rate

Customer Testimonial

"[TBD] Customer Testimonial to This CaseTo be Added After Customer Confirmation,TestimonialContent Will CoverDuring Event Assurance PeriodSystem Deployment Effect、Lightning Event HandlingCases、Lightning Compliance Audit Improvement& OtherDimensions."

— Customer Lead [TBD]

Get Similar Solution

If your enterprise has For SimilarStadium、Event AssuranceLightning Safety Monitoring Needs, Please Contact Us to a customized solution. The FEXLINK technical team will provide solutions based on your VenueScale、Lightning Characteristics、Event AssuranceRequirements,providing end-to-end IoT solutions.