Public Transit Port Electrical Safety Online Monitoring

Port Electrical Safety Monitoring

UsingESAElectrical Safety MonitoringAlarm Device、ESB Electrical Safety Monitoring Terminal、ESTTemperature Sensor&ESX& OtherProducts,toPortCold Ironing System、Crane、Reefer Container、Distribution RoomScenariosto7×24HoursElectrical SafetyOnline Monitoring,Real-TimeSensingLeakage、Temperature、CurrentAbnormality,EnsurePortInComplexMarineEnvironmentUnderofSafetyStable Operation.

INDUSTRY

Public Transit

CUSTOMER

A Port OperatorEnterprise

CUSTOMER TYPE

Large Container Port Operator

DEPLOYMENT

[TBD]

01 · BACKGROUND

Customer Background

Enterprise Type

A Port OperatorEnterprise,Responsible toLarge Container Port OperationManagement&Handling Equipment Maintenance,isNational Key Transportation Infrastructure Facilities OperatorUnit.

Enterprise Scale: [TBD]

PortScale

PortContainsContainer Terminal、Bulk Cargo Terminal、Cold Ironing System、Reefer Container Yard& OtherMultiFacilities,Distribution Room、Substation、CraneWidely DistriButed,Power Load Large& TypesComplex.

Berth Count/Throughput:[TBD]

Industry Position

National Critical Transportation Infrastructure, Need Strict Compliance with JTS 165 "General Design Code to Sea Port" & GB 50057 "Design Code to Protection of Buildings Against Lightning" Standard, Very High Safe Operation Requirements.

Compliance Standard: JTS 165 / GB 50057

02 · CHALLENGES

Business Challenges

01

Marine Environment Corrosion Causes High Electrical Hazard Incidence

PortLongPeriodinHighSalt Spray、High HumiditylyMarineEnvironment,Cold Ironing System、Crane Electrical Cabinet、Reefer ContainerDistributionLineInsulation Easy Aging,Leakage&Electrical FireHazardSignifiCantly Higher thanOnshoreScenario,TraditionalManual InspectionHard to&TimeDetect.

02

Handling EquipmentPower Large、TemperatureMonitoringHard

Bridge Crane、Gantry Crane、Conveyor& OtherLargePowerHandling EquipmentLongPeriodHigh LoadOperation,Cable Joint&Distribution BoxTemperatureEasyAbnormality RiseHigh,LackContinuityOnlineTemperatureMonitoring Means,OverheatHazardHard toEarly Warning.

03

Cold Ironing SystemSafety MonitoringRequirementsHigh

Berthed Ships Use Cold Ironing Within Range, Voltage WaveAction、Leakage、Overload& OtherRiskProminent,Need forCold IroningSocket、Distribution Cabinet、TransformerReal-Time Electrical Safety Monitoring,Ensure Crew&PortPersonnelSafety.

04

Reefer ContainerGroupMonitoring PointsDense

Reefer Container YardDistributionCircuitDense、Single Box Power Large,Manual Inspection Time-Consuming, Coverage Limited,andSome RegionsAffected byOperationControlHard toHigh-FrequencyInspection,ElectricalHazardHard to&TimeDetect.

03 · SOLUTION

Solution

System Architecture Diagram

System Architecture Diagram Placeholder - To be replaced with real architecture diagram

Noe: The above is a placeholder image, to be replaced with a real system architecture diagram. The architecture diagram should show Sensing Layer(ESA/ESB/EST/ESXand other terminals)→ Network Layer(FG Smart Gateway)→ Platform Layer(FEXLINK Cloud)three-layer structure.

Deployed Product List

Product Name Model Quantity Function
ESAElectrical Safety MonitoringAlarm Device ESA [TBD] Deployed atPortMainDistribution Cabinet&Cold IroningDistribution Cabinet,Real-Time Monitoring ofResidual Current、Cable Temperature、Overload& OtherElectrical Safety Parameters,AbnormalityInstantLocal Alarm
ESB Electrical Safety Monitoring Terminal ESB [TBD] Deployed atCrane Control Cabinet&Reefer ContainerDistribution Box,Acquire Leakage、Temperature、Current、Voltage& OtherMultipleNeedsElement Data
ESTTemperature Sensor EST [TBD] Attached toCraneCable Joint、Cold IroningSocket、Breaker Contacts& OtherKeyHot Spots,AchieveHigh PrecisionTemperatureContinuityMonitoring
ESXElectrical Safety MonitoringDevice ESX [TBD] Deployed atBulk CargoHandling EquipmentControl Box,Comprehensive MonitoringConveyor、Loading Bridge& OtherCircuitElectrical Status
FG Smart Gateway FG [TBD] AggregationESA/ESB/EST/ESXand other terminalsData,Edge Processing, via4G/Optical FiberUploadCloud Platform
FEXLINK Cloud Platform Cloud 3.0 1 Set DataAggregation、VisualizationDisplay, Alarm Push、O&MWork Order、Compliance Report Auto Generation

Noe: Product quantities are TBD, actual deployment quantities will be determined based on PortFacilitiesscale and monitoring point density, to be provided by the project implementation party.

Network Topology

Sensing Layer: ESAElectrical Safety MonitoringAlarm DeviceDeployed atPortMainDistribution Cabinet&Cold IroningDistribution Cabinet,ESB Electrical Safety Monitoring TerminalDeployed atCrane Control Cabinet&Reefer ContainerDistribution Box,ESTTemperature SensorAttached toCraneCable Joint/Cold IroningSocket/Breaker Contacts& OtherKeyHot Spots,ESXElectrical Safety MonitoringDeviceDeployed atBulk CargoHandling EquipmentControl Box.

Network Layer: Each sensing terminal connects via RS485 bus(Modbus-RTUProtocol)to nearby FG Smart Gateway,FG Gateway uploads via Optical Fiber Private Network/4GCellular Network Uplink toPort Operator CompanyInGrid Network,Key NodesPointsupporting dual-link redundant backup to ensure Data transmission reliability.

Platform Layer: Data aggregates to FEXLINK Cloud Platform(Private Deployment),ProvideWeb& MobileVisualizationDashboard、Real-Time Alarm、HistoryTrend Analysis、O&MWork Order Dispatch、Compliance Report Auto Generation、Multi-Role Permission Management& Other Functions.

Integration Layer: Cloud PlatformThroughStandardREST API / Modbus TCPProtocol,&PortExistingTOS (Terminal Operating System)、SCADA、Equipment Management SystemIntegration,Achieve Data Sharing&Linked Alarm,Unified IntoO&MWork Order Process.

04 · IMPLEMENTATION

Implementation Process

1

Site Survey & Solution Design

Engineers VisitPortSite to Survey,Survey Distribution System Structure、Cold Ironing System、Crane&Reefer ContainerDistribution,outputting point list and system deployment plan.

Cycle: [TBD]

2

Equipment Installation & Wiring

ESA/ESB/ESXInstalled at EachDistribution Cabinet&Control Box,ESTTemperature SensorAttachedKeyHot Spots,FG Smart Gateway Centralized Deployment,Complete RS485 Bus Wiring & Power Connection.

Cycle: [TBD]

3

System Commissioning & Platform Integration

ConfigureFG GatewayacquiringParameters&Upload Transmission Cycle,CompleteFEXLINK Cloud PlatformAccount Setup、Point Binding、Alarm Threshold Setting、&ExistingTOS/SCADA SystemIntegrationCommissioning.

Cycle: [TBD]

4

Trial Operation & Personnel Training

System Trial Operation& Calibration Data Accuracy,toO&MPersonnel to Platform Operation、Alarm Handling、Work Order Flow、Report Export& Other Training,CompleteProject Acceptance & Delivery.

Cycle: [TBD]

05 · RESULTS

Application Effects

7×24h

All-Weather Online Monitoring

[TBD]

Monitoring Point Cover Count

[TBD]

Reduced Manual Inspection Hours

[TBD]

Early Warning Hazard Count

[TBD]

Emergency Fault Response Time Reduction

100%

Compliance Report Auto-Generation Rate

Customer Testimonial

"[TBD] Customer Testimonial to This CaseTo be Added After Customer Confirmation,TestimonialContent Will CoverSystem DeploymentBetoe & AfterO&MEfficiency MoM、Electrical Hazard Early Detection Cases、Cold Ironing Safety Monitoring Improvement& OtherDimensions."

— Customer Lead [TBD]

Get Similar Solution

If your enterprise has For SimilarPort、TerminalElectrical Safety Monitoring Needs, Please Contact Us to a customized solution. The FEXLINK technical team will provide solutions based on your PortFacilitiesScale、Compliance Requirements,providing end-to-end IoT solutions.