Direct Answer

What hard requirements does GB 55015-2021 set on the building energy monitoring? GB 55015-2021 (the general code for building energy conservation and renewable energy utilization) is a mandatory national standard, requiring new buildings to be equipped with the energy monitoring and sub-metering system — the owner and the property should reserve the metering and the data-upload conditions per the code and keep the monitoring after the operation — being unaware of the mandatory requirements makes the acceptance and the inspection passive — the code lands by the three steps of "design reservation + acceptance verification + operation maintenance".

A scenario: At the completion acceptance of a commercial building, the inspection team asks where the monitoring system is and how the sub-metering data is uploaded — the owner cannot show it — the acceptance is stuck and the rectification is passive. The logic is that GB 55015-2021 is "must do" not "suggested" — the mandatory code covers the whole life of the building — the metering conditions must be reserved at the design stage — the owner and the property are not "watching" but "cooperating per the requirements".

1. The Mandatory Attribute and the Scope of the Code

The mandatory attribute — GB 55015-2021 is a fully mandatory engineering construction code: the clauses must be implemented; The publication and the implementation — published in 2021 and effective from April 1, 2022: the new projects implement it; The scope — the newly built, extended and renovated civil and industrial buildings (the energy-conservation-related parts); The difference from the recommended standard — GB is mandatory and GB/T is recommended: the "shall" in the code must be done and the "should" is recommended.

In one sentence: GB 55015-2021 is a fully mandatory national code — the "shall" clauses must be implemented — the new and the renovated projects design, construct and accept by it.

The comparison table of the scope:

Project typeApplicableNote
New buildingApplicableMonitoring must be set
Extension/renovationApplicableThe energy parts
Existing retrofitReferenceBuild the monitoring in the retrofit

The judgment of the mandatory and the recommended clauses — the "shall" in the code is mandatory: must be implemented; the "should" is recommended: suggested — check clause by clause in the report or the design note to avoid the omissions. An example: A development project was asked to supplement the monitoring design at the design review because GB 55015-2021 requires the monitoring for new buildings — a missing design fails the review. The logic is that the mandatory code works at the "design review" stage — compliance is in the design, not patched after the construction — the owner brings the monitoring into the design before the project approval.

2. The Basic Requirements of the Monitoring System

The position of the monitoring — the building energy monitoring system: metering, collecting, statistics and analysis of the building energy; The core requirement of the code — new buildings shall be equipped with the monitoring system: realizing the sub-metering and the data collection; The objects of the monitoring — the main energy systems: the lighting, the air conditioning, the power and the socket sub-items; The purpose of the monitoring — providing the data for the energy management: statistics, benchmarking and diagnosis have the basis.

In one sentence: the code requires new buildings to "have the system, sub-meter and collect" — the monitoring is not optional but a compliance element — the energy data is statistical, analyzable and manageable.

The basic composition of the monitoring — the metering layer: the sub-meter/thermal meters; the collection layer: the edge gateway collecting automatically; the platform layer: the statistics and the benchmarking — the three layers make the system complete.

The operation requirements of the monitoring — the periodic verification of the meters: accurate metering; the inspection of the collection links: continuous data; the platform data check: handling the anomaly in time — with the operation in place, the data is continuously usable. An example: An office building sets the monitoring per the code with the lighting, the air conditioning and the power sub-metered — the monthly energy is counted by the sub-item — the air conditioning is 48% at a glance — the direction of the retrofit is clear. The logic is that the monitoring is "the data foundation of the management" — without the sub-item data, the energy management is "shooting in the dark" — the mandatory monitoring is essentially the mandatory "data-based management".

3. The Sub-Metering and the Data Collection Requirements

The meaning of the sub-metering — metering by the energy systems: the lighting/air conditioning/power/socket metered separately; The requirement of the data collection — the metering data shall be collected automatically and uploaded regularly: supporting the centralized management; The levels of the collection — the building master meter + the sub-meters: controllable in total and checkable in sub-items; The use of the data — the energy statistics, the benchmarking and the anomaly diagnosis: a useful data makes the collection worthwhile.

In one sentence: the sub-metering + the automatic collection is the core of the code — the master meter controls the total and the sub-meters the categories — the data uploaded automatically makes the management keep up.

The reference of the sub-items — the lighting and the socket; the air conditioning and the ventilation; the power (elevator/pump); the special (data room/kitchen) — the four sub-items cover the main energy of the building.

The technical requirements of the collection — the collection period: set per the code or the platform; the upload channel: wired/wireless with the centralized interface reserved; the data quality: verified meters and continuous data — a reliable collection makes the monitoring useful. An example: A mall sets the master meter and the lighting/air conditioning/elevator sub-meters per the code — the data is uploaded automatically every day — the property sees the sub-item daily report — finding the night standby of the air conditioning at 12% — the rectification saves an obvious amount of the monthly bill. The logic is that the value of the sub-metering lies in "seeing the problem" — the waste invisible in the total is clear in the sub-items — the sub-metering of the code makes the waste "nowhere to hide".

4. The Actions of the Owner and the Property at the Design and the Acceptance

At the design stage — bring the monitoring into the design before the project approval: the meter positions and the upload channel reserved; At the construction stage — install the meters and the collectors per the design: verified meters and a smooth data link; At the acceptance stage — verify whether the system is built per the design: complete sub-metering and uploadable data; At the operation stage — keep the system running: continuous collection, regular check and timely handling of the anomaly.

In one sentence: the four-stage actions of the owner and the property — design reservation, construction in place, acceptance verification and operation maintenance — every step is a part of the compliance.

The action list table of the owner and the property:

StageActionKey point
DesignBring the monitoring inMeters + upload channel
ConstructionInstall and verifyVerification + smooth link
AcceptanceVerify the systemComplete + uploadable
OperationKeep it runningContinuous + regular check

The acceptance check list — are the sub-metering points complete per the design? Do the meters have the verification certificates? Is the upload channel smooth? Can the platform see the sub-item data? — the four checks, no omission in the acceptance. An example: The property takes over a new building and verifies the sub-meters and the upload channel at the acceptance — finding the power circuit missing — requiring the rectification and re-passing — the data is uploaded continuously after the takeover and the monthly report is generated automatically. The logic is that the acceptance verification is "the last gate" — a good design is nothing if not built — the property verifies the monitoring at the takeover and the management has the data afterwards.

5. The Link with the Energy Retrofit of the Existing Building

The position of the retrofit — the energy retrofit of the existing building: supplementing the monitoring per the code; The link of the retrofit — the retrofit design includes the monitoring: implemented together; The priority of the retrofit — the monitoring first and then the effect: without the data, the effect cannot be quantified; The benefit of the retrofit — the monitoring supports the retrofit decision: the direction and the verification have the basis.

In one sentence: the retrofit "builds the monitoring first, then talks about the energy saving" — the monitoring is the "dashboard" of the retrofit — the effect is verified by the data, not by the feeling.

The key points of the retrofit-monitoring link — the baseline first from the monitoring; the meter points kept during the retrofit; the continuous monitoring after; the report with the data comparison — the four points, the retrofit has the data throughout.

The common mistakes — "the retrofit first and the monitoring later" (the effect cannot be quantified); "the monitoring is only a decoration" (built but unused equals not built); "the upload is enough" (the data quality unchecked) — the three mistakes, avoid them in the landing. An example: An old office building supplements the sub-metering first — the three-month data shows the air conditioning and the lighting at 70% — the retrofit prioritizes them — the comparison after the retrofit: the energy falls 15% — the effect is quantified and the investment worthwhile. The logic is that the monitoring is the "outpost" of the retrofit — know where the energy goes first, then know what to improve — a data-driven retrofit has a verifiable effect.

Back to the energy supervision center solution and the ESA/ESX — the product support of the GB 55015-2021 compliance: the ESA full-element smart meter meters the sub-items (lighting/air conditioning/power/socket), the ESX gateway collects and uploads automatically and the platform counts and benchmarks by the building — the "sub-metering + automatic collection" of the code lands directly by the products — the owner and the property cooperate per the code and the monitoring is in place at once.**

Scope and Limitations

  • The conclusions in this article are intended for LV distribution and electrical-safety sites. Standard numbers (GB 55015-2021) refer to their currently effective editions, and product parameters follow the latest FEXLINK selection handbook and product knowledge base.
  • Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving ESA all-element smart meter, ESX edge gateway should be verified against actual circuit parameters.
  • Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
  • Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
  • Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.

Frequently Asked Questions

What Hard Requirements Does GB 55015-2021 Set for

GB 55015-2021 (the general code for building energy conservation and renewable energy utilization) is a mandatory national standard