Direct Answer

How to configure the meters of the sub-metering? By the "total-sub-equipment" three levels — 0.5S/0.5 for the settlement and the class 1 for the management — the communication by the density: the RS485 bus or the ethernet/4G gateway — more wasted, less insufficient — one selection table, the points, the precision, the current and the communication all settled.

A scenario: The energy monitoring project — the drawings full — which circuits need the meters, how many levels and what communication — no one says — either the meters insufficient or the budget exceeded. The logic is that the sub-metering is "the foundation of the energy data" — the points by the three levels, the precision by the use and the communication by the density — the structured, the data not wasted.

The pain is common — the engineers pick the meters by the habit: the same precision everywhere and the same communication everywhere — the money wasted on the unnecessary — the structured selection avoids the waste.

1. The Three-Level Points

The three levels — the total (the incoming), the sub (the circuit) and the equipment (the device) — three layers; The total — the incoming metering: the total use — must; The sub — the main circuits: the AC, the lighting, the power and the special — by the sub-metering needs; The equipment — the main devices: the air compressor, the chiller and the key lines — by the focus.

In one sentence: the three levels = the total-sub-equipment — the total must, the sub by the items and the equipment by the focus — the layered, the data a network.

The reference table:

LevelPointRole
TotalIncomingThe total
SubCircuitThe split
EquipmentDeviceThe focus

The principle — the sub by the item needs: the AC/lighting/power/special; the equipment by the share: the large first; the total by the control: the incoming must. An example — A park: 1 total + 6 sub (the AC/lighting/power/special) + 4 equipment (the compressor/chiller) = 11 — complete, not wasted. The logic is that the point is "the skeleton" — the total base, the sub split and the equipment focus — the clear, the data a system.

The phase — the meters can be added gradually: the total and the main sub first, the equipment later — the system grows without the rework — the level structure supports the expansion.

2. The Precision (0.5S/0.5/1)

The meaning — the error class: the 0.5S the most accurate, the class 1 the common; The settlement — the 0.5S/0.5: the fee settlement must be accurate; The management — the class 1: the trend and the benchmark enough; The cost — the higher, the more expensive: by the use, not the blind stack.

In one sentence: the precision by the "use" — 0.5S/0.5 for the settlement and the class 1 for the management — the accurate where needed, the saved where not.

The reference table:

ScenePrecisionNote
Settlement0.5S/0.5Must
Management1Enough
Equipment1Trend

The verification — the new meters checked and the periodic verified: the precision kept, the data credible — the period by the DL/T 448. The misconception — not all the most accurate: the 0.5S for the management wastes the budget — by the use, the cost best. An example — The total 0.5S (the settlement) + the sub class 1 (the management) — both. The logic is that the precision is "where the money goes" — more on the settlement, less on the management — by the use, the edge.

The suggestion — ask the supplier for the error curve before the order: the accuracy in the light-load zone matters — the meter measured at the 10% load, the error different from the rated.

The ratio — the measurement range of the meter: the meter measures through the CT, the current of the meter itself small — the CT ratio defines the measured range.

3. The Current and the CT

The current — the rated: 1.5(6)A, 5(20)A and 10(40)A — by the load; The CT — the current transformer: by the primary current — the meter through the CT; The CT precision — matched: the 0.2S CT with the 0.5S meter and the 0.5 with the class 1; The key — by the actual load: the margin 20%-30%.

In one sentence: the current by the "load" and the CT by the "primary" — the margin and the matched precision — the right, the data accurate.

The key of the CT — by the "long-term" current, not the starting: the 60%-80% of the ratio optimal — the measurement in the linear zone. An example — The max load 400 A — the CT 500/5 and the meter 1.5(6)A — the margin 25%. The logic is that the current and the CT are "the match of the range" — the load the spec and the ratio the margin — the right, the range not wasted.

4. The RS485 vs the Ethernet/4G

The RS485 — the serial: one bus with many meters (e.g. 32) — the concentrated, the near; The ethernet — the network: each meter or the gateway online — the scattered, the large; The 4G — the wireless: the no-network with the 4G upload — the scattered, the no wiring; The choice — by the density and the condition: the RS485 for the concentrated and the ethernet/4G for the scattered.

In one sentence: the communication by the "density and the environment" — the RS485 for the concentrated, the ethernet/4G for the scattered and the 4G for the no-network — the right, the data up.

The reference table:

SceneWayNote
ConcentratedRS485Low
ScatteredEthernetLarge
No-network4GWireless

The reliability — the RS485 daisy chain and the terminal resistor; the industrial switch for the ethernet; the signal and the traffic for the 4G — the link reliable, the data not lost. The networking — the RS485 bus to the ESX gateway to the ethernet to the platform — the industrial ring optional — one link, the data direct. An example — The concentrated 11 meters — the RS485 to the gateway and the ethernet up — two layers, stable. The logic is that the communication is "the path of the data" — the different by the density — the RS485 base and the ethernet/4G backstop, the data not lost.

The check of the list — before the construction: the drawings vs the list one by one — the total, the sub and the equipment all there — the missing found before the wiring.

5. The Selection List

The content — the point, the precision, the current, the CT and the communication — five in one table; The landing — by the circuit one by one: no miss, no repeat; The check — the total must, the items covered and the equipment not missed — passed, constructible.

In one sentence: the list = "the construction drawing" — the five in one — the settled, no rework.

An example list:

PointPrecisionCurrentCTCommunication
Total0.5S1.5(6)A500/5RS485
AC11.5(6)A200/5RS485
Lighting11.5(6)A100/5RS485
Compressor11.5(6)A300/5RS485

Back to the ESA/ZSA/ESX family — the landing: the ESA for the total and the sub, the ZSA for the circuit and the ESX for the RS485 gathering and the ethernet/4G upload — the selection, by this table directly.

Scope and Limitations

  • The conclusions in this article are intended for LV distribution and electrical-safety sites. Standard numbers (DL/T 448) refer to their currently effective editions, and product parameters follow the latest FEXLINK selection handbook and product knowledge base.
  • Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving ESA all-element smart meter, ZSA embedded multi-function smart meter, ESX intelligent edge computing gateway should be verified against actual circuit parameters.
  • Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
  • Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
  • Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.

Frequently Asked Questions

How to Size Sub-Metering

By the "total-sub-equipment" three levels — 0.5S/0.5 for the settlement and the class 1 for the management — the communication by the density: the RS485