SFA Multi-Parameter Electrical Controller
Used for multi-parameter electrical monitoring of enterprise main circuits, key feeders, and public power distribution circuits.
The industrial park multi-tenant power distribution and safety solution should first establish three boundary tables—property rights, O&M, and metering—before deploying terminals. SFA is used for comprehensive monitoring of key circuits; ESB for three-phase phase and imbalance; ESF and EST for residual current and temperature; ESX aggregates by enterprise or power distribution zone and connects to the platform. The platform needs to support tiered permissions for enterprises, buildings, circuits, and devices; cross-tenant network, control permissions, and alarm handling responsibilities must be clarified at the design stage.
The solution focuses on data isolation and layered O&M in multi-tenant scenarios, avoiding concentrating all enterprise and circuit data into one master table without permission boundaries.
Used for multi-parameter electrical monitoring of enterprise main circuits, key feeders, and public power distribution circuits.
Used for three-phase phase and imbalance analysis, providing data for load management.
Supplement residual current and temperature monitoring by circuit and measurement point.
Aggregate data by enterprise or power distribution zone, and establish tiered accounts, alarms, and audits.
Terminals collect electrical and anomaly data in enterprise main cabinets, public power distribution, and key feeders.
ESX aggregates by enterprise, building, or power distribution station room, executing local rules.
FEXLINK organizes data by park, enterprise, building, circuit, and role.
Park management and enterprise O&M view, acknowledge, and handle alarms according to their authorized scope.
Terminals collect electrical and anomaly data in enterprise main cabinets, public power…
SFA Multi-Parameter Electrical Controller · ESB Three-Phase Unbalance Monitor
Verify park, enterprise, building, circuit, and device codes.
Park main-meter data cannot be directly allocated to specific enterprises as a settlement basis.
It can be distinguished by tenant and role, but data isolation, permission approval, and O&M responsibility design must be completed.
Usually handled by the park's power distribution O&M, but ultimately should be clarified through a responsibility matrix before delivery.
Confirmation should be made enterprise by enterprise according to interface documentation, network policies, point lists, and data ownership; a unified open-interface assumption cannot be used.
Usually cannot be used directly for settlement. Allocation requires independent metering, clear boundaries, and confirmed rules.
No. ESB focuses on phase and imbalance; power quality needs to be configured by the specific ESE model and project requirements.
Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.
Contact FEXLINK