Home / Solutions / Direct Lightning Current Peak and Event Recording

Direct Lightning Current Peak and Event Recording

Direct lightning current event recording should, under the condition of clarified down-conductor path, conductor size and installation orientation, adopt an applicable FL lightning-current recording device and aggregate via FG. The page may describe event time, path and recording purpose, but peak range, waveform capability, protection rating and installation method must be confirmed by the specific model and datasheet.

Lightning Protection & GroundingLightning Current Events

Solution overview

This solution reduces the problem of lacking event evidence after a lightning strike. The starting point of data value is correctly selecting the monitored conductor and installation location, rather than inferring the lightning path from alarms alone after the fact.

Applicable industries

  • Industrial and Public Infrastructure

Primary user roles

  • Lightning Protection Engineer
  • Electrical Operations and Maintenance
  • Project Integrator

Problems addressed

  • Lightning strike occurrence time, path and count lack continuous records, making after-the-fact reconstruction difficult.
  • Down-conductor size, coil orientation, outdoor environment and device protection conditions are inconsistent, so the installation method cannot be universal.

Recommended product combination

FEXLINK

FEXLINK IoT Platform

Provides device management, alarm, historical data, permission and O&M record capabilities; the deployment method is to be confirmed by the project.

System architecture and data flow

Direct Lightning Current Peak and Event Recording System TopologyFour-layer data flow across perception, edge control, platform and application for Direct Lightning Current Peak and Event Recording.01Perception layer
Install an applicable FL recording device on a confirmed down conductor or lightning-current path.
02Edge / control layer
FG aggregates lightning-current events and associates them with station, line or facility codes.
03Platform layer
FEXLINK stores event time, device state and O&M verification records.
04Application layer
Lightning-protection and O&M personnel check SPDs, grounding and site facilities according to the event time…

Perception layer

Install an applicable FL recording device on a confirmed down conductor or lightning-current path.

Edge / control layer

FG aggregates lightning-current events and associates them with station, line or facility codes.

Platform layer

FEXLINK stores event time, device state and O&M verification records.

Application layer

Lightning-protection and O&M personnel check SPDs, grounding and site facilities according to the event time.

Data flow

  1. Lightning current forms an event along the monitored conductor.
  2. FL acquires the event information supported by the model.
  3. FG aggregates the data and uploads it to the platform.
  4. The platform forms event records and triggers a verification process.

Integration and interfaces

  • Confirm the conductor diameter, installation orientation, available space and sensor fixing method.
  • Confirm indoor/outdoor installation conditions and the protection requirements of the corresponding model.
  • When integrating with an existing monitoring system, define the event number, time source and retransmission rules.

Applicable standards

  • IEC 62305 series standards for protection against lightning (applicable parts and version to be confirmed by the project)
  • GB 50057 Design Code for Lightning Protection of Buildings (applicable clauses and version to be confirmed by the project location and design documents)

Acceptance and delivery boundaries

Suggested acceptance dimensions

  • The monitoring point establishes a unique correspondence with the protected object, down conductor or facility.
  • Event records have device, time and state information, and can distinguish communication anomalies.
  • The installation method and protection treatment are inspected on site without changing the function of the original lightning-protection down conductor.

Limitations and exclusions

  • Lightning-current recording alone cannot prove that the protected equipment is definitely damaged or undamaged.
  • Without confirmed conductor conditions, installation orientation and model protection rating, construction should not proceed.
  • The platform event count is not equal to the total number of natural lightning strikes and must be interpreted in combination with the device coverage scope.

Operational value

  • Provides a time basis for facility inspection after a lightning strike.
  • Helps O&M distinguish lightning events from ordinary equipment faults.
  • Forms traceable lightning-protection operation records.

Selection guidance

  • Select the sensor structure and installation accessories according to the size and orientation of the down conductor or conductor.
  • Select the specific FL model according to indoor/outdoor environment, communication method and maintainability.
  • When small-current transient monitoring is needed, evaluate FL-11122 rather than directly extending the range of the main lightning-current device downward.

Typical implementation patterns

  • A typical implementation pattern is to install single-point recording first after clarifying the down conductor, then expand to multiple key facilities.
  • Another pattern is to observe lightning-current events side by side with SPD state and grounding trends.

Before retrofit → With the solution

Before retrofit

  • Lightning strike occurrence time, path and count lack continuous records, making after-the-fact reconstruction difficult.
  • Down-conductor size, coil orientation, outdoor environment and device protection conditions are inconsistent, so the installation method cannot be universal.

With the solution

  • Provides a time basis for facility inspection after a lightning strike.
  • Helps O&M distinguish lightning events from ordinary equipment faults.
  • Forms traceable lightning-protection operation records.

How to evaluate the effect

01

Measurable signal

Install an applicable FL recording device on a confirmed down conductor or lightning-cur…

02

Data source

FL Lightning Current / Transient Current Monitor · FG Smart Gateway (Zigbee, RS485 & Ethernet)

03

Review method

The monitoring point establishes a unique correspondence with the protected object, down conductor or facility.

04

Acceptance boundary

Lightning-current recording alone cannot prove that the protected equipment is definitely damaged or undamaged.

Frequently asked questions

How should the installation location be selected?

A conductor that can represent the target lightning-current path and meets the sensor installation conditions should be selected, and confirmed on site by a lightning-protection professional.

Is an immediate shutdown inspection required after an event is recorded?

The system should not be shut down directly based on event records alone; judgment should be made according to the project contingency plan in combination with SPD, grounding and equipment states.

Can one set of devices cover all down conductors?

Coverage cannot be assumed by default. The coverage scope is related to the installation location, conductor path and specific product capability, and requires point-by-point design.

What devices does "direct lightning current peak and event recording" typically consist of?

FL: records events such as lightning current peak and energy; indoor/outdoor model, range, protection rating and installation orientation are confirmed by the datasheet; FG: aggregates downstream lightning-protection monitoring devices, performs protocol conversion and transmits states and events to the upper-level platform; FEXLINK: provides device management, alarm, historical data, permission and O&M record capabilities, with the deployment method confirmed by the project.

What site conditions should be verified before implementing "direct lightning current peak and event recording"?

Select the sensor structure and installation accessories according to the size and orientation of the down conductor or conductor; select the specific FL model according to indoor/outdoor environment, communication method and maintainability; when small-current transient monitoring is needed, evaluate FL-11122 rather than directly extending the range of the main lightning-current device downward.

Request a matched product combination and project review

Share the application, circuit conditions and existing system interfaces so engineers can confirm selection and implementation boundaries.

Contact FEXLINK