Public Transit Expressway Electrical Safety Online Monitoring

Expressway Electrical Safety Monitoring

UsingESAElectrical Safety MonitoringAlarm Device、ESB Electrical Safety Monitoring Terminal、ESTTemperature Sensor&ESX& OtherProducts,toHighwayAlong-Route Distribution Room、Toll Station、Service Area、TunnelM&E Facilitiesto7×24HoursElectrical SafetyOnline Monitoring,Real-TimeSensingLeakage、Temperature、CurrentAbnormality,EnsureTransportation Infrastructure FacilitiesInMultipleScenarioUnderofSafetyStable Operation.

INDUSTRY

Public Transit

CUSTOMER

A HighwayOperationEnterprise

CUSTOMER TYPE

Large Expressway Operator

DEPLOYMENT

[TBD]

01 · BACKGROUND

Customer Background

Enterprise Type

A HighwayOperationEnterprise,Responsible toHighwayofOperationManagement、M&E FacilitiesMaintenance&Toll Services, National Key Transportation Infrastructure Operator.

Enterprise Scale: [TBD]

Road SectionScale

HighwayContainsMain Line, Tunnel, Bridge、Service Area、Toll Station& OtherMultiFacilities,Along-Route Distribution Room、Equipment Room、MonitoringMinCenterWidely DistriButed,M&E FacilitiesTypesMultiple、Power LoadComplex.

Road SectionRange/FacilitiesCount:[TBD]

Industry Position

National Key Transportation Infrastructure Facilities,Need Strict ComplianceJTG D70/2《HighwayTunnelDesignSpecifications"&GB 50016《Building DesignFire ProtectionSpecifications》& OtherStandard,Safe OperationRequirements Very HighHigh.

Compliance Standard: JTG D70/2 / GB 50016

02 · CHALLENGES

Business Challenges

01

Along-RouteFacilitiesMinScattered、Manual Inspection Cost High

HighwayAlong-Route Distribution Room、Toll Station、Service Area、TunnelSubstationMinScattered Across Hundreds of Kilometers of Road Sections,Manual Inspection Time-Consuming, Coverage Limited,Some Regions Affected by Traffic ControlHard toHigh-FrequencyInspection.

02

TunnelM&ELoadLarge、TemperatureMonitoringHard

TunnelLighting、VentilationMachine、Fire Pump& OtherLargePowerEquipmentLongPeriodOperation,Cable Joint&Distribution BoxTemperatureEasyAbnormality RiseHigh,LackContinuityOnlineTemperatureMonitoring Means,OverheatHazardHard toEarly Warning.

03

OutdoorEnvironmentCausesElectrical EquipmentAgingAccelerates

HighwayDistribution FacilitiesMultipleinOutdoorEnvironment,Long-Term WithstandHigh Temperature、High Humidity、Lightning Strike& OtherHarsh Conditions, Electrical Equipment Insulation Easy Aging,Leakage&Electrical FireHazardSignifiCantly Higher thanIndoorScenario.

04

Emergency ResponseLackReal-TimeData Support

Under EmergenciesO&MTeamNeedNeeds Real-Time Electrical Status Data Support Emergency Decision, But Existing SCADA System NotCoverEndDistributionCircuit,DataBlind SpotsAffectEmergency ResponseEfficiency& Handling Accuracy.

03 · SOLUTION

Solution

System Architecture Diagram

System Architecture Diagram Placeholder - To be replaced with real architecture diagram

Noe: The above is a placeholder image, to be replaced with a real system architecture diagram. The architecture diagram should show Sensing Layer(ESA/ESB/EST/ESXand other terminals)→ Network Layer(FG Smart Gateway)→ Platform Layer(FEXLINK Cloud)three-layer structure.

Deployed Product List

Product Name Model Quantity Function
ESAElectrical Safety MonitoringAlarm Device ESA [TBD] Deployed atAlong-Route Distribution RoomMainDistribution Cabinet&TunnelSubstation,Real-Time Monitoring ofResidual Current、Cable Temperature、Overload& OtherElectrical Safety Parameters,AbnormalityInstantLocal Alarm
ESB Electrical Safety Monitoring Terminal ESB [TBD] Deployed atToll Station、Service AreaSecondary Distribution Box&M&EEquipmentControl Cabinet,Acquire Leakage、Temperature、Current、Voltage& OtherMultipleNeedsElement Data
ESTTemperature Sensor EST [TBD] Attached toTunnelCable Joint、Breaker Contacts、Busbar& OtherKeyHot Spots,AchieveHigh PrecisionTemperatureContinuityMonitoring
ESXElectrical Safety MonitoringDevice ESX [TBD] Deployed atTunnelM&EControl Box,Comprehensive MonitoringLighting、Ventilation、Fire Pump& OtherCircuitElectrical Status
FG Smart Gateway FG [TBD] AggregationESA/ESB/EST/ESXand other terminalsData,Edge Processing, via4G/Optical Fiber Private NetworkUploadCloud Platform
FEXLINK Cloud Platform Cloud 3.0 1 Set DataAggregation、VisualizationDisplay, Alarm Push、O&MWork Order、Compliance Report Auto Generation

Noe: Product quantities are TBD, actual deployment quantities will be determined based on HighwayAlong-RouteFacilitiesscale and monitoring point density, to be provided by the project implementation party.

Network Topology

Sensing Layer: ESAElectrical Safety MonitoringAlarm DeviceDeployed atAlong-Route Distribution RoomMainDistribution Cabinet&TunnelSubstation,ESB Electrical Safety Monitoring TerminalDeployed atToll Station、Service AreaSecondary Distribution Box&M&EEquipmentControl Cabinet,ESTTemperature SensorAttached toTunnelCable Joint/Busbar/Breaker Contacts& OtherKeyHot Spots,ESXElectrical Safety MonitoringDeviceDeployed atTunnelM&EControl Box,CoverLighting、Ventilation、Fire Pump& OtherCircuit.

Network Layer: Each sensing terminal connects via RS485 bus(Modbus-RTUProtocol)to nearby FG Smart Gateway,FG Gateway uploads via HighwayPower Grid Optical Fiber/4GCellular Network Uplink toRoad SectionMonitoringMinCenterGrid Network,Key NodesPointsupporting dual-link redundant backup to ensure Data transmission reliability.

Platform Layer: Data aggregates to FEXLINK Cloud Platform(Private Deployment),ProvideWeb& MobileVisualizationDashboard、Real-Time Alarm、HistoryTrend Analysis、O&MWork Order Dispatch、Compliance Report Auto Generation、Multi-Role Permission Management& Other Functions.

Integration Layer: Cloud PlatformThroughStandardREST API / Modbus TCPProtocol,&HighwayExistingSCADA、MonitoringMinCenter、M&EO&MManagement SystemIntegration,Achieve Data Sharing&Linked Alarm,Unified IntoO&MWork Order Process.

04 · IMPLEMENTATION

Implementation Process

1

Site Survey & Solution Design

Engineers VisitHighwayAlong-RouteSite to Survey,Survey Distribution System Structure、Distribution Room&TunnelSubstationDistribution、M&E FacilitiesList,outputting point list and system deployment plan.

Cycle: [TBD]

2

Equipment Installation & Wiring

ESA/ESB/ESXInstalled at EachDistribution Cabinet&Control Box,ESTTemperature SensorAttachedKeyHot Spots,FG Smart Gateway Centralized Deployment,Complete RS485 Bus Wiring & Power Connection.

Cycle: [TBD]

3

System Commissioning & Platform Integration

ConfigureFG GatewayacquiringParameters&Upload Transmission Cycle,CompleteFEXLINK Cloud PlatformAccount Setup、Point Binding、Alarm Threshold Setting、&ExistingSCADA/MonitoringMinCenterSystemIntegrationCommissioning.

Cycle: [TBD]

4

Trial Operation & Personnel Training

System Trial Operation& Calibration Data Accuracy,toO&MPersonnel to Platform Operation、Alarm Handling、Work Order Flow、Report Export& Other Training,CompleteProject Acceptance & Delivery.

Cycle: [TBD]

05 · RESULTS

Application Effects

7×24h

All-Weather Online Monitoring

[TBD]

Monitoring Point Cover Count

[TBD]

Reduced Manual Inspection Hours

[TBD]

Early Warning Hazard Count

[TBD]

Emergency Fault Response Time Reduction

100%

Compliance Report Auto-Generation Rate

Customer Testimonial

"[TBD] Customer Testimonial to This CaseTo be Added After Customer Confirmation,TestimonialContent Will CoverSystem DeploymentBetoe & AfterO&MEfficiency MoM、Electrical Hazard Early Detection Cases、Emergency ResponseCapabilityImprovement& OtherDimensions."

— Customer Lead [TBD]

Get Similar Solution

If your enterprise has For SimilarHighway、Transportation Infrastructure FacilitiesElectrical Safety Monitoring Needs, Please Contact Us to a customized solution. The FEXLINK technical team will provide solutions based on your Road SectionScale、FacilitiesDistribution、Compliance Requirements,providing end-to-end IoT solutions.