Direct Answer
Which feeders need meters and what CT size should be chosen? Follow four decisions: first screen the must-meter feeders by "energy level and assessment importance", then select the CT by the feeder's rated current (common loads should fall in 30%-100% of the CT range), determine the meter type by three-phase or single-phase, and choose rail-type or embedded by the on-site space.
A scenario: dozens of feeders in a switchboard — metering all of them wastes money, metering none misses key loads — selection relies on experience. The logic of selection is that must-meter feeders depend on capacity and assessment, the CT depends on range matching, the meter type depends on the phase and the form depends on the on-site space — four decisions, no misses and no waste.
1. Screening the Must-Meter Feeders: Three Types
Type one, large capacity — the energy users: the transformer low-voltage side, main feeders and large motor circuits; Type two, assessment targets — linked to assessment: workshop assessment, team accounting and independent contract units; Type three, independent accounting — cost units: independent product lines and independent rental/billing circuits; The screening principle — by weight: high capacity, assessment and accounting come first; The meaning of screening — no misses on the key ones: screen the musts first, extend by budget later.
In one sentence: must-meter feeders are large capacity, assessment targets and independent accounting units — screen by these three types.
An example: A factory screens: the main feeder and 3 large motors are musts — workshop assessment circuits are musts — small lighting circuits are deferred. The logic is that there are many feeders and a limited budget — first guarantee meters on the big energy users and the assessment targets — small-load circuits come in phase 2 — the screening order determines the data quality.
2. The CT Ratio and Load Current Matching Principle
Principle one, range matching — common loads should fall in 30%-100% of the CT range; Principle two, ratio selection — by the rated current: the CT primary current is about the feeder's rated current; Principle three, accuracy consideration — the middle of the range is the most accurate: 30%-100% has the smallest error; Principle four, avoid oversizing — a big cart pulled by a small horse: an oversized CT has a large light-load error; The meaning of matching — trustworthy data: readings are accurate only when the range matches.
In one sentence: the CT selection is that common loads fall in 30%-100% of the range — select the ratio by the feeder's rated current.
The range reference — the interval to avoid: a load persistently below 10% of the range visibly magnifies the error; The range review — after selection: after commissioning, use the platform to watch the load-factor curve and confirm that the load stays in the matching interval.
An example: A feeder rated 400 A — choose CT 400/5 — the common load of 200 A falls in the middle of the range — the readings are accurate. The logic is that a CT is not bigger-is-better — it is range matching — the smallest error is when the common load falls in 30%-100% — an oversized CT enlarges the error at light load — select by the rated current, do not oversize.
3. Light-Load Error Magnification: Causes and Countermeasures
Cause one, the excitation share — at light load the excitation current shares a larger part and the error is magnified; Cause two, a small secondary current — the secondary current is small at light load and the relative error grows; Cause three, the accuracy characteristic — CT accuracy is best in the middle of the range and worse at the ends; Countermeasure one, choose a matched CT — range matching: do not keep the load below 10% long-term; Countermeasure two, separate the feeders — a large CT for a large load and a small CT for a small load.
In one sentence: the light-load error comes from a larger excitation share and a small secondary current — the countermeasures are range matching and separating the feeders.
An example: A feeder rated 600 A but carrying only 30 A — the CT is oversized — the light-load error is large — after changing to 100/5 the readings are accurate. The logic is that the light-load error is the consequence of a wrong selection — a CT too large and a load too small — the readings are distorted — the countermeasure is not to live with it but to change to a matched CT — a large CT for a large load and a small CT for a small load.
4. Matching the Meter Type to Single-Phase and Three-Phase Feeders
Type one, a single-phase meter — single-phase feeders: lighting and small single-phase loads; Type two, a three-phase four-wire meter — three-phase four-wire feeders: common low-voltage feeders, three-element metering; Type three, a three-phase three-wire meter — three-phase three-wire feeders: some high-voltage metering, two elements; The matching principle — by the connection: a feeder of a given phase gets a meter of the same element count; The meaning of matching — correct metering: a wrong meter type means the wrong element count and a biased reading.
In one sentence: the meter-type match is a single-phase meter for single-phase feeders and a three-phase meter for three-phase feeders — selected by the connection.
An example: A factory: single-phase meters for lighting circuits and three-phase four-wire meters for power circuits — all connections correct. The logic is that the meter type is determined by the feeder connection — a single-phase load gets a single-phase meter and a three-phase load gets a three-phase meter — the readings are accurate only when the element count matches — installing the wrong meter type is a simple but common error.
5. Split-Core vs Wound CT: The Trade-off in Retrofit Scenarios
A split-core CT — openable: installable without cutting the busbar, convenient for retrofits; A wound CT — closed: requires threading or cutting the line, usually more accurate; Trade-off one, the retrofit scenario — split-core: old cabinets without rewiring and a short outage window; Trade-off two, the accuracy requirement — wound: preferred for high-accuracy feeders; Trade-off three, the space limit — look at the cabinet: split-core is more flexible in narrow space; The meaning of the trade-off — by scenario: split-core for retrofits and wound for high accuracy.
In one sentence: a split-core CT is convenient for retrofits and a wound CT is more accurate — choose by scenario.
An example: An old-cabinet retrofit: the outage window is short — a split-core CT is installed without power-off — the accuracy is enough for management. The logic is that the retrofit scenario fears "cutting the line and losing power" most — a split-core CT solves the installation problem — high-accuracy feeders use the wound type — choose by the on-site condition and do not get stuck on the installation method.
6. Back to YESLON: How to Configure SFA/SFB/SFE and ESA
The SFA/SFB/SFE role — multi-element measurement and control: in-cabinet metering plus monitoring in one; The ESA role — full-element itemization: the mainstay of high-accuracy itemized metering; The configuration logic — by circuit: ESA for assessment and billing circuits and SFA/SFB/SFE for monitoring circuits; The solution support — the supervision center: metering data is uniformly connected; The YESLON promise — a selection with a basis: matched item by item by feeder, range and meter type.
In one sentence: the YESLON configuration is ESA for assessment circuits and SFA/SFB/SFE for monitoring circuits — matched by circuit.
An example: A factory configures: ESA with a matched CT range for assessment circuits and SFA/SFB/SFE for monitoring circuits — all data accurate. The logic is that the four selection decisions and the product configuration share one logic — the must-meter feeders, the CT range, the meter type and the form are matched item by item — with the metering front-end selected correctly, the supervision-center data is trustworthy — selection is the source of data quality.
7. Self-Check: Four Questions to See Whether the Circuit Selection Is Correct
Question one, are the musts screened — musts: are the large-capacity, assessment and independent-accounting feeders screened out; Question two, is the CT matched — range: does the common load fall in 30%-100%; Question three, is the meter type correct — connection: does the single-phase/three-phase meter type match; Question four, is the form suitable — on site: is split-core/wound chosen by scenario.
In one sentence: the four questions are musts, range, meter type and form — all answered, the selection has no misses and no waste.
A self-check example: A factory answers the four questions — the musts are screened, the CT is matched, the meter type is correct and the form is suitable — the metering front-end is right at once. Select in four decisions: first screen the must-meter feeders by "energy level and assessment importance" (large capacity, assessment targets and independent accounting units), then select the CT by the feeder's rated current (common loads should fall in 30%-100% of the CT range), determine the meter type by three-phase or single-phase, and choose rail-type or embedded by the on-site space (split-core CT for retrofits and wound for high accuracy) — a large CT for a large load and a small CT for a small load — the light-load error is the consequence of a wrong selection — with the selection right, the data is trustworthy.
Scope and Limitations
- The conclusions in this article are intended for LV distribution and electrical-safety sites. Standard numbers (DL/T 448) refer to their currently effective editions, and product parameters follow the latest FEXLINK selection handbook and product knowledge base.
- Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving SFA/SFB/SFE multi-element electrical controller, ESA all-element smart meter should be verified against actual circuit parameters.
- Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
- Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
- Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.
Frequently Asked Questions
Which Feeders Need Meters and What CT Size
Follow four decisions: first screen the must-meter feeders by "energy level and assessment importance"