Direct Answer
What is peak shaving actually shifting? It shifts not the energy but the "time of use" — load is classified into three types by temporal flexibility: time-shiftable (the use moment can be moved as a whole, e.g. chargeable equipment), interruptible (can be cut briefly and recovers after the cut, e.g. air-conditioning compressors) and non-shiftable (continuous process, e.g. reactors) — peak shaving moves the use moment of the first two types from the high-price period to the low-price period, and the economic value of the transfer equals the price spread times the shiftable energy.
A scenario: A company treats all load alike when talking about "shifting the peak" — it also puts the reactor into the valley plan — the process does not allow it and the plan cannot land. The logic is that the premise of shifting is the physical property of the load — some load can be moved as a whole, some can only be interrupted briefly, and some cannot move at all — classify the load first, then talk about shifting — if the classification is wrong, the plan is dead.
1. The Three Load Classes: Time-Shiftable, Interruptible and Non-Shiftable
The time-shiftable load — the use moment can be moved as a whole: chargeable equipment, storable steps and buffered cooling — what moves is the "start time"; The interruptible load — can be cut briefly and recovers after the cut: air-conditioning compressors, pumps and some auxiliary equipment — what moves is the "running gap"; The non-shiftable load — continuous process that must run continuously: reactors, kilns and continuous production lines — cannot be moved, only staggered at the start or accepting the high price.
In one sentence: the shiftable moves the "moment", the interruptible moves the "gap" and the non-shiftable can only be "staggered" — three classes, three flexibilities.
The comparison table of the three classes:
| Item | Time-shiftable | Interruptible | Non-shiftable |
|---|---|---|---|
| Typical device | Charging, storable step | Air-conditioning, pump | Reactor, kiln |
| Flexibility | Whole moment | Brief cut | Cannot move |
| What moves | Start time | Running gap | Stagger only |
| Shaving priority | Highest | Second | Untouched |
The grading of the shiftability — first grade: the moment moves freely, e.g. a charging pile can adjust the start time at will; second grade: limited by the process rhythm, e.g. the sterilizing step must keep the order; third grade: needs a buffer to move, e.g. cooling relies on a cold-storage tank — the earlier the grade, the more flexible the shaving.
An example: Three load classes coexist in a park — the charging piles (shiftable), the air-conditioning (interruptible) and the reactors (non-shiftable) — when shaving, move the charging piles first, interrupt the air-conditioning next and leave the reactors alone..
2. The Physical Constraints of Time Shifting: Process, Inventory and Buffer
The process constraint — the step order cannot be broken: the previous step must finish before the next, so the shift must keep the order; The inventory constraint — the intermediate inventory is the buffer: the larger the inventory, the bigger the shifting space; The buffer constraint — air tanks, water tanks and batteries: buffered load can leave the grid for a short time; The time constraint — the shifting window is limited: not "as long as you want", limited by the process rhythm.
In one sentence: the process keeps the order, the inventory buffers and the window is limited — the constraints decide the "ceiling" of the shift.
The quantitative judgment — the process constraint: the longest waiting time of a step decides the lower limit; the inventory constraint: the duration the intermediate inventory can support decides the upper limit; the buffer constraint: the tank capacity divided by the consumption rate decides the off-grid duration — substitute the three and the window appears.
An example: A food enterprise wants to move the sterilizing step to the valley — the sterilized products must be filled immediately (the process constraint) — adding cold storage in the middle (the inventory buffer) expands the shifting window from 1 hour to 4 hours. Another example: The "non-shiftable" electrolytic cells of an aluminum smelter — continuous current is the process itself and shaving is useless for them — but the auxiliary dust-removal fans can be interrupted for 30 minutes — what truly participates in shaving is the interruptible auxiliary load. And the logic is that the shifting space is not born fixed — adding a buffer expands the window — the process constraint decides the lower limit and the buffer the upper limit — identifying the constraints is finding the way to expand the window;
3. The Interruption Duration and Frequency of the Interruptible Load
The interruption duration — how long it can stop: limited by the process-allowed stop time; The interruption frequency — how many times it can stop: frequent start-stop may hurt the equipment life; The recovery cost — the energy and wear of the restart: the electricity saved by the interruption must subtract the restart cost; The interruption boundary — interruptible does not mean interrupting freely: the three boundaries of duration, frequency and recovery cost.
In one sentence: the interruptible load has "three boundaries" — duration, frequency and recovery cost — interruption is not free.
The relationship between the interruption boundaries and the shaving capacity — the larger the interruption duration: the larger the shaving power that can be released; the higher the interruption frequency: the more times it can participate in shaving; the smaller the recovery cost: the higher the net benefit of the interruption — the product of the three boundaries is the shaving-capacity ceiling of the interruptible load — evaluating the interruptible load means calculating the three boundaries first.
An example: A company's air-conditioning compressor can be interrupted for 15 minutes — the room temperature stays in the allowed range — but it cannot be interrupted 8 times a day: the frequent start-stop damages the compressor life. The self-check of the interruption misjudgments — mistake one: interrupting freely once it can be interrupted, ignoring the frequency ceiling and damaging the compressor by frequent start-stop; mistake two: counting only the electricity saved by the interruption but not the restart energy, computing the net benefit wrong; mistake three: treating the non-shiftable load as interruptible, and the reactor is scrapped by an interruption — the three self-checks keep the interruption strategy from stepping into the pits. And the logic is that the flexibility of the interruptible load has a cost — interrupting 15 minutes saves electricity, but frequent interruption damages the equipment — record the interruption duration, frequency and recovery cost in the ledger and the interruption strategy counts.
4. The Economic Value of the Temporal Transfer: The Spread Times the Shiftable Energy
The spread — the price difference between the high-price and low-price periods: the larger the spread, the higher the transfer value; The shiftable energy — the energy that can be transferred: the power of the shiftable load times the shiftable duration; The transfer value — the spread times the shiftable energy: the net benefit must subtract the transfer cost; The marginal judgment — the transferable energy has a ceiling: prioritize the load with the largest spread and the largest energy.
In one sentence: the transfer value = the spread times the shiftable energy — the net benefit = the transfer value minus the transfer cost — move the load with the largest spread and the largest energy first.
The calculation of the transfer benefit — the transfer value = the shiftable energy times the spread; the transfer cost = the dispatch cost + the loss + the restart energy; the net benefit = the transfer value minus the transfer cost — sort by the net benefit and move the highest first — the load with a negative net benefit loses money by moving.
An example: A company can move 200 kWh of charging to the valley — the peak-valley spread is 0.8 yuan/kWh — the transfer value is 160 yuan/day — subtracting 20 yuan of dispatch and loss cost — the net benefit is 140 yuan/day. Another example: A charging station moves the charging start time of 50 piles back 2 hours as a whole — from the peak to the valley — each pile charges 30 kWh on average and the spread is 0.8 yuan — each saves 24 yuan/day and the whole station saves 1,200 yuan/day — the shiftability of the charging pile is the typical "moment transfer".**
5. How to Build the Load-Flexibility Ledger
The structure of the ledger — one load per row: name, power, class, shiftable duration and interruption boundary; The source of the ledger — evaluate device by device: compare the three features (shiftable/interruptible/non-shiftable); The update of the ledger — update when the process changes: line changes, added buffers and replaced equipment all change the ledger; The use of the ledger — the input of the shaving strategy: the platform sorts the priority and calculates the transfer value by the ledger.
In one sentence: one load per row — name, power, class, shiftable duration and interruption boundary — the ledger is the "raw material" of the shaving strategy.
The field definitions of the ledger — the load name: the unique identifier; the rated power: the ceiling of the shaving capacity; the flexibility class: shiftable/interruptible/non-shiftable; the shiftable duration: the length of the shifting window; the interruption boundary: the duration, frequency and recovery cost; the transfer value: the estimate of the spread times the shiftable energy — six fields, one load per row.
An example: A company builds a 30-row load ledger — 10 rows shiftable, 8 interruptible and 12 non-shiftable — the platform sorts the shaving order by the ledger — the charging piles move first, the air-conditioning next and the reactors stay. And the logic is that the ledger is an "asset inventory" — without knowing which load can move, shaving is a blind move — with the ledger built, the strategy can be sorted — the load decomposition of the TIANYAN E-01 can assist in identifying the load classes.
Back to the TIANYAN E-01 match — the TIANYAN E-01 (NILM load decomposition) decomposes the power curve of each load from the total-meter data — identifies the use features of the charging piles, air-conditioning and pumps — automatically tags the load classes (shiftable/interruptible/non-shiftable) — the energy supervision center sorts the shaving order and calculates the transfer value by the ledger — manual device-by-device evaluation becomes automatic system classification — the ledger upgrades from a "hand-made table" to an "automatic profile".**
Peak shaving shifts not the energy but the "time of use" — the load is divided into three classes: shiftable (the moment can move), interruptible (briefly cuttable) and non-shiftable (continuous process) — the time shift is constrained by the process, inventory and buffer — the interruptible load has the three boundaries of duration, frequency and recovery cost — the transfer value = the spread times the shiftable energy, and the net benefit subtracts the transfer cost — the load-flexibility ledger is one load per row: name, power, class, shiftable duration and interruption boundary — the TIANYAN E-01 load decomposition automatically identifies the load classes and the energy supervision center sorts the shaving strategy by the ledger — classify the load first, then talk about shifting — with the right classification, the plan can land.
Scope and Limitations
- The conclusions in this article are intended for LV distribution and electrical-safety sites. Criteria are compiled from public codes and FEXLINK product documentation, and product parameters follow the latest selection handbook and product knowledge base.
- Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving Tianyan engine E-01 (NILM load disaggregation) should be verified against actual circuit parameters.
- Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
- Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
- Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.