Direct Answer

The platform pops up "YJ1" — what must the crew do, and how much time does each level allow? The 6 levels map by score: 85-100 normal, 70-84 attention, 55-69 level-1 warning, 40-54 level-2 warning, 20-39 level-1 alarm (handle within 48 hours), 0-19 level-2 alarm (immediate outage inspection); the level directly maps to the response time limit. The Qianzhi engine (6-level alarm system) translates the score into an action: the lower the score, the more certain the anomaly and the tighter the deadline — see the level, and you know how much time you have.

A scene: at midnight the platform popped up "YJ1" — the duty operator was confused: "Should I go now or tomorrow?" — without a clear time limit for each level, an alarm is just a "notification", not an "instruction". The value of the 6-level alarm: level = action — seeing the level tells you "how urgent, who handles it, how long" — the alarm turns from information into an instruction.

1. The 6-Level Score Range Comparison

Normal level (85-100) — the equipment runs normally: data in the normal range — no action, routine inspection only; Attention level (70-84) — data deviates from normal but is not abnormal: record and observe, strengthen attention at the next inspection — no dedicated handling; Level-1 warning (55-69) — an anomaly sign appears: trend drift or mild exceedance — the duty operator reviews, an inspection within a week is arranged; Level-2 warning (40-54) — the anomaly is clear: sustained exceedance or worsening trend — the shift leader reviews, an inspection within 72 hours is arranged; Level-1 alarm (20-39) — the anomaly is severe: approaching or beyond the red-line magnitude — must be handled within 48 hours — reported by the shift leader, handled within a deadline; Level-2 alarm (0-19) — the anomaly is critical: touching the red line or extremely high risk — immediate outage inspection — the site responds immediately.

In one sentence: the 6 levels tighten progressively from 85 to 0 — normal takes no action, attention records, warnings inspect within a deadline, alarms handle within a deadline, critical stops immediately — the lower the score, the heavier the action.

A comparison example: three scores for the same circuit temperature anomaly: 76 attention level (record and observe), 58 level-1 warning (inspect within a week), 28 level-1 alarm (handle within 48 hours) — the same anomaly, and the score change corresponds to the action change. The score is not a "pretty number" but the "scale of action" — wherever the score falls, the action corresponds.

2. The Response Time Limits and Responsible Persons of Each Level

Attention level (70-84) — responsibility: the duty operator records; time limit: follows the inspection rhythm, no dedicated limit — observation first; Level-1 warning (55-69) — responsibility: the duty operator reviews; time limit: inspection completed within a week — the warning gives a "time window"; Level-2 warning (40-54) — responsibility: the shift leader reviews; time limit: inspection within 72 hours — the warning escalates and the limit tightens; Level-1 alarm (20-39) — responsibility: the shift leader reports and the supervisor supervises; time limit: must be handled within 48 hours — the alarm level handles within a deadline; Level-2 alarm (0-19) — responsibility: the duty operator responds immediately and the supervisor directs on site; time limit: immediate outage inspection — the critical level acts at once.

In one sentence: time limits and responsibilities correspond level by level — attention the operator records, warning the operator checks, level-2 warning the leader checks, level-1 alarm the supervisor supervises, level-2 alarm stops immediately — responsibility follows the level and the limit tightens with it.

A responsibility example: an alarm at 32 points (level-1 alarm): the shift leader reported to the supervisor → the supervisor supervised handling within 48 hours → the repair was completed in 30 hours — the responsibility chain was clear and the limit was honored. The level fixes responsibility and time limit, so handling has a "handle" — who is responsible and within how long, one alarm says it all.

3. Scores Rise and Fall Dynamically with Trend Drift

The score is not static — the score of the same point changes over time: a rising trend lowers the score, a falling trend raises it — the score is a "real-time dynamic value"; Trend drift drives it — the score changes with trend drift: the mean keeps rising → the trend dimension in the 7-dimension score rises → the total falls → the level upgrades — the trend dimension is the main driver of score changes; The direction of change — a falling score = level upgrade (more urgent); a rising score = level downgrade (returning to normal) — the direction tells the crew whether the situation is worsening or improving; The meaning of dynamics — the dynamic score lets the alarm "follow the situation": auto-upgrade when the trend worsens, auto-downgrade when it recovers — the crew sees "the current state", not "a historical snapshot".

In one sentence: the score rises and falls dynamically with the trend — a rising trend lowers the score and upgrades the level; a falling trend raises the score and downgrades it — the score is a real-time state, not a one-time conclusion.

A dynamic example: the score of a terminal temperature: week 1 at 72 (attention) → week 2 trend rising to 58 (level-1 warning) → week 3 continuing up to 35 (level-1 alarm) → after handling, back to 78 (attention) — over a month, the score drew a complete "worsen-handle-recover" curve. The dynamic score makes alarms "alive" — the crew sees the score change and knows whether the situation is escalating or easing — handling follows the score.

4. The Standard Clauses and Confidence That Alarms Carry

Standard clauses — alarms carry the corresponding standard basis: a level-1 alarm attaches the triggered standard clause (such as a GB standard provision) — handling has a basis and is traceable; Confidence — alarms carry confidence: how sure the model is of the conclusion (such as 90%) — high confidence is more credible, low confidence needs careful review; The role of clause + confidence — the clause answers "based on what", the confidence answers "how sure" — the two let the crew judge "how reliable this alarm is"; False-alarm prevention — low confidence + unmatched correlation = suspected noise: the platform shows "review suggested" — confidence is the first information for false-alarm prevention.

In one sentence: alarms carry "standard clauses + confidence" — the clause gives the basis, the confidence gives the certainty — the two let the crew judge "how trustworthy this alarm is" before handling.

A carried example: an alarm popup: residual current 312 mA, level-1 alarm, basis GB 13955 related clauses, confidence 95% — clause + confidence + level all at once — the duty operator judged directly "credible, handle immediately". An alarm is not a bare "there is a problem" — with clause, confidence and level, the handling decision lands in one step.

5. How Shift Scheduling Aligns with Levels

The alignment principle — duty resources align with alarm levels: enough operators on shift during high-incidence periods, responsible persons on call when levels are high — scheduling follows alarm risk; Levels and shifts — attention/warning levels: handled in the regular shift; alarm/critical levels: the responsible person must be reachable 7×24 — the alarm level requires "someone can always receive"; Handover points — hand over by level: unclosed alarm/warning items handed over item by item — the level decides the handover priority; The duty board — the duty board groups by level: level-2 alarms on top, level-1 alarms next — the board lets the operator see "today's most urgent matters" at a glance.

In one sentence: scheduling alignment is "resources follow risk" — enough operators in high-incidence periods, critical-level responsible persons reachable at any time, handover prioritized by level — scheduling is not fixed but dynamically adjusted with the levels.

A scheduling example: in the thunderstorm season at a campus: alarm volume rose → night duty was strengthened → the level-2 alarm responsible person was reachable 7×24 → handover went item by item by level — over one thunderstorm season, alarm handling sped up 40% on average. Scheduling follows risk, and handling has a guarantee — levels aligned with scheduling, alarms are not "unmanned at night".

6. A Complete Reading Example

The full flow: a panel terminal temperature alarm: score 35 → level-1 alarm (the 20-39 band) → time limit: handle within 48 hours → responsible: shift leader reports, supervisor supervises → carried clause: the monitoring-standard clause for temperature alarms → confidence 92% → handling: outage repair completed in 30 hours, poor contact confirmed → re-test score recovered to 76 (attention) → alarm closed. From popup to closure: seeing the level tells the limit and responsibility, seeing the clause and confidence tells the basis and credibility, and the recovered score after handling verifies the result — a 35-point level-1 alarm completed the full "read the level → fix responsibility → handle → re-check" loop.

In one sentence: reading a 6-level alarm = see the level for the action + see the limit for the rhythm + see the responsible person for the division + see the clause and confidence for the judgment — four pieces read at once, handling without panic and responsibility clear.

7. Back to FEXLINK: How the Qianzhi Engine (6-Level Alarm System) Works

The Qianzhi engine (6-level alarm system) maps the 7-dimension perception score to 6 levels: 85-100 normal, 70-84 attention, 55-69 level-1 warning, 40-54 level-2 warning, 20-39 level-1 alarm (handle within 48 hours), 0-19 level-2 alarm (immediate outage inspection) — the level directly maps to the response time limit and responsible person. The usage checklist: ① on popup, read the level and score first → ② match the limit by level (warning within a week / alarm 48h / critical immediate) → ③ find the responsible person by level → ④ read the clause and confidence to judge credibility → ⑤ after handling, see the score change to verify closure — level = action, score = state.

One summary: the 6-level alarm = score mapped to level, level mapped to limit and responsibility — progressively tightening from 85 to 0: normal takes no action, attention records, warnings inspect within a deadline, alarms handle within a deadline, critical stops immediately — the level directly maps to the response time limit. Seeing YJ1 tells you "how urgent, who handles it, within how long" — the alarm turns from information into an instruction, and handling turns from experience into a system.

One reminder: when an alarm arrives, read three things first — the level (how urgent), the limit (within how long), the responsible person (who handles) — then the clause and confidence (reliable or not) — with all four read, handling is calm. The level is the alarm's "translator" — turning the score into an action — use the level, and an alarm is no longer just a notification.

Scope and Limitations

  • The conclusions in this article are intended for LV distribution and electrical-safety sites. Standard numbers (GB 13955) refer to their currently effective editions, and product parameters follow the latest FEXLINK selection handbook and product knowledge base.
  • Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving Qianzhi engine (six-level alarm system) should be verified against actual circuit parameters.
  • Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
  • Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
  • Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.

Frequently Asked Questions

Decoding the Six Alarm Levels

The platform pops up "YJ1" — what must the crew do, and how much time does each level allow