Direct Answer

For a sub-meter, should you choose Class 1.0 or Class 0.5? For management-oriented itemized metering, Class 1.0 is generally enough; for circuits linked to assessment and billing, choose Class 0.5; the energy reading equals the meter's indicated value × the CT ratio (current ratio × voltage ratio), and misreading the ratio is the most common source of errors of tens of times.

A scenario: A factory changes meters — the multiplier is not applied — the report is off by 80 times — the account does not balance. The logic of reading is that energy = indicated value × CT ratio × PT ratio — read the ratio correctly first, then compute the multiplier — a wrong multiplier is not a small deviation but one of tens of times.

1. How to Choose the Accuracy Class: 1.0 / 0.5 / 0.2S

Class one, 1.0 — for management: itemized metering and daily monitoring are enough; Class two, 0.5 — for assessment and billing: circuits tied to billing and assessment; Class three, 0.2S — for gateway metering: gateway meters and high-requirement situations; The selection principle — by use: Class 1.0 for management, Class 0.5 for assessment and billing; The meaning of selection — no waste: higher accuracy costs more, select by need.

In one sentence: the accuracy class is 1.0 for management, 0.5 for assessment and billing, and 0.2S for gateway — selected by use.

The cost of the class — accuracy and price are positively correlated: a Class 0.5 meter costs notably more than a Class 1.0 meter; The trade-off — select by need: installing Class 0.5 everywhere is waste — only assessment and billing circuits deserve it; The reference — standards: GB/T 17215 defines the accuracy classes of electricity meters and DL/T 448 specifies gateway metering requirements.

An example: A factory's itemization: Class 1.0 for daily monitoring and Class 0.5 for workshop assessment — saves money and works. The logic is that higher accuracy is not always better — match it to the use — 1.0 is enough to watch trends, 0.5 is reliable for assessment — use high accuracy where it matters.

2. How to Read the Current Transformer (CT) Ratio

Ratio one, the rated ratio — the label: such as 400/5 — 400 A primary and 5 A secondary; Ratio two, the meaning — scaling: large currents are scaled down for metering; Ratio three, the way to read — check the nameplate: the rated ratio is on the CT nameplate; Ratio four, the caution — taps: some CTs have multiple tap positions; The meaning of the ratio — the multiplier basis: the ratio is the amplification of the energy.

In one sentence: the CT ratio is primary current/secondary current (such as 400/5) — on the nameplate and the basis of the multiplier.

An example: A factory CT of 400/5 — 1 A on the secondary corresponds to 80 A on the primary — the energy is amplified 80 times. The logic is that the CT scales the large current down into the meter — the meter reading must be scaled back up to the true value — the amplification is the ratio — 400/5 = 80 times — a misread ratio makes the energy wrong by 80 times — this is how "a misread multiplier becomes a deviation of tens of times".

3. The Complete Multiplier: CT Ratio × PT Ratio

Step one, the current ratio — the CT ratio: primary current ÷ secondary current; Step two, the voltage ratio — the PT ratio: primary voltage ÷ secondary voltage; Step three, the total multiplier — multiplication: multiplier = CT ratio × PT ratio; Step four, the energy — the product: energy = indicated value × total multiplier; An example — CT 400/5 × PT 10 kV/100 V = 80 × 100 = 8,000 times.

In one sentence: the multiplier is the CT ratio × the PT ratio — the energy is the indicated value × the multiplier.

An example: A factory's 10 kV circuit: CT 400/5 (80 times) and PT 10 kV/100 V (100 times) — the total multiplier is 8,000 — an indicated 0.5 kWh equals 4,000 kWh actual. The logic is that a high-voltage circuit has both transformers scaling down — the two multipliers multiply into the total — missing either one makes the energy wrong by 100 times — read both when reading the multiplier.

4. The Multiplier Difference between Three-Phase Three-Wire and Three-Phase Four-Wire

A three-wire circuit — three-phase three-wire: two-element metering; without a PT the multiplier is usually the CT ratio; A four-wire circuit — three-phase four-wire: three-element metering; the multiplier is likewise CT × PT; Difference one, the connection — different: three-wire has two elements, four-wire has three; Difference two, the multiplier — the same: both are computed as CT × PT; Difference three, the voltage level — key: only high-voltage circuits have a PT multiplier; The meaning of the difference — do not miss it: low-voltage circuits usually have only the CT multiplier.

In one sentence: three-wire and four-wire differ in connection but share the same multiplier algorithm — only high voltage has a PT multiplier, low voltage usually has only the CT.

An example: A factory low-voltage circuit: three-phase four-wire CT 200/5 — the multiplier is 40 — no PT term. The logic is that low-voltage circuits usually have no PT — the multiplier is just the CT ratio — high-voltage circuits have the PT term — the connection determines the number of elements but not the multiplier algorithm — do not miss the PT on high voltage and do not add one on low voltage.

5. Common Reading Errors

Error one, missing the ratio — the most common: the indicated value is taken directly as the energy; Error two, wrong tap — a tap error: the CT tap is connected or read incorrectly; Error three, missing the PT — a high-voltage error: the PT multiplier is not applied on high-voltage circuits; Error four, mixing the phases — a connection error: three-wire read as four-wire, elements wrongly connected; The consequence — a large deviation: deviations of tens of times all stem from the multiplier.

In one sentence: common errors are missing the ratio, a wrong tap, missing the PT and mixing the phases — a wrong multiplier is wrong by tens of times.

An example: A factory check: the report is off by 80 times — the CT tap is found wrongly connected — corrected and the account balances. The logic is that nine in ten reading errors are in the multiplier — check the ratio first, then the tap, then the PT — a "three-check on the multiplier" — deviations of tens of times are basically multiplier problems, not broken meters.

6. Back to YESLON: How to Choose ZSA and ESA

The ZSA role — in-cabinet itemization: the embedded meter, used with CTs; The ESA role — full-element itemization: supports both direct connection and CT connection; The selection logic — by circuit: assessment and billing circuits choose higher accuracy; The solution support — the supervision center: multiplier parameters are configured on the platform; The YESLON promise — a checkable multiplier: ratios and multipliers are maintainable and auditable on the platform.

In one sentence: the YESLON meter selection is ZSA for in-cabinet itemization and ESA for full-element itemization — accuracy selected by circuit.

An example: A factory configures: ESA Class 0.5 for assessment circuits and ZSA Class 1.0 for management circuits — multipliers configured on the platform — reports no longer mismatch. The logic is that the meter is selected by use and the accuracy by circuit — meter accuracy plus platform multiplier configuration is a double guarantee — the multiplier is checkable and auditable — deviations of tens of times are avoided at the source.

7. Self-Check: Four Questions to See Whether the Multiplier Is Read Correctly

Question one, is the ratio read — the ratio: is the CT ratio confirmed from the nameplate; Question two, is the PT counted — the PT: is the PT multiplier applied on high-voltage circuits; Question three, is the tap correct — the tap: is the CT tap checked; Question four, does the report balance — balance: does the reported energy match the total meter.

In one sentence: the four questions are ratio, PT, tap and balance — all answered, the multiplier is error-free.

A self-check example: A factory answers the four questions — the ratio is read, the PT is counted, the tap is correct and the report balances — deviations of tens of times are gone. For management-oriented itemized metering, Class 1.0 is generally enough; for circuits linked to assessment and billing, choose Class 0.5 (Class 0.2S for gateway metering); the energy reading equals the meter's indicated value × the CT ratio (current ratio × voltage ratio); the low-voltage multiplier is the CT ratio and the high-voltage multiplier is CT × PT; a misread ratio or a wrong tap is the most common source of deviations of tens of times — check the ratio, the PT, the tap and the balance — the multiplier is error-free and the reports balance.

Scope and Limitations

  • The conclusions in this article are intended for LV distribution and electrical-safety sites. Standard numbers (GB/T 17215, DL/T 448) refer to their currently effective editions, and product parameters follow the latest FEXLINK selection handbook and product knowledge base.
  • Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving ZSA embedded multi-function smart meter, ESA all-element smart meter should be verified against actual circuit parameters.
  • Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
  • Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
  • Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.

Frequently Asked Questions

Sub-Meter

For management-oriented itemized metering, Class 1.0 is generally enough; for circuits linked to assessment and billing, choose Class 0.5