Direct Answer
Tianyan claims 67 models — which ones should a project use first? The 67 models are organized into four boards: S safety (20 — insulation, leakage, three-phase unbalance and other hazard lead-time signals), Q power quality (15 — harmonics, voltage deviation, harmonic responsibility), E energy use (15 — NILM, load forecasting, specific consumption) and C conservation actions (10 — reactive compensation, efficiency optimization). The P0 launch set is four models: S-02 leakage drift, Q-01 harmonic responsibility, E-01 NILM and E-06 load forecasting — start with these four to answer the four most common questions, then expand by topic. Delivery runs in three phases, V1 to V1.5 to V2, with the 67 models going live in priority order.
A scenario: A project team faced 67 models and could not choose. Using the four-board map, they located the pain first: a factory that cannot see equipment-level energy use goes to the E board; one afraid of leakage hazards goes to the S board. They launched S-02 (leakage drift) and E-01 (NILM) first, saw results within two weeks, then expanded the Q and C boards — selection changed from "facing 67 models" to "answering 4 questions first".
1. The Four Boards of 67 Models: Read the Map Before Picking
S safety board (20) — hazard lead time: early signals of insulation, leakage, three-phase unbalance and other safety risks; Q power quality board (15) — power quality: harmonics, voltage deviation, harmonic responsibility and other quality issues; E energy use board (15) — energy insight: NILM, load forecasting, specific consumption and other consumption issues; C conservation board (10) — consumption reduction actions: reactive compensation, efficiency optimization and other saving measures; How the boards relate — S watches safety, Q watches quality, E watches quantity, C watches actions: from "is there a problem" to "how to solve it".
In one sentence: the 67 models equal S safety 20, Q quality 15, E usage 15 and C actions 10 — the four boards cover the four main lines of safety, quality, quantity and actions.
A map example: One cement plant used the S board for "motor insulation decline", the Q board for "harmonics heating the transformer", the E board for "workshop-level electricity breakdown" and the C board for "reactive compensation advice" — four boards answer four different levels of questions. Read the map to pick a board, then pick models within the board — selection changes from "1 of 67" to "1 of 4".
2. The S Safety Board (20): Hazard Lead Time
The S board's role — hazard lead time: risk signals given before the fault occurs; S board representatives — leakage drift, insulation deterioration, three-phase unbalance, grounding anomalies; The S board's output — lead time: not "already burned" but "about to burn"; Typical S-board questions — "Is this motor about to suffer insulation breakdown?" "Is this loop's leakage getting worse?" S board users — electrical safety leads: use lead time to schedule preventive maintenance.
In one sentence: the S safety board means hazard lead time — insulation, leakage, unbalance — answering "is a failure about to happen".
An S example: In one factory, the S-02 leakage drift model found leakage current creeping up for three weeks — an early alert led to an inspection that found damp insulation. The S board's value is turning emergency repair into scheduled work — lead time is its core output.
3. The Q Power Quality Board (15): The Quality of Electricity
The Q board's role — power quality: the waveform and stability of voltage and current; Q board representatives — harmonic analysis, voltage deviation, harmonic responsibility, unbalance remediation advice; The Q board's output — attribution: who is polluting the grid and by how much; Typical Q-board questions — "Who produces the harmonics?" "Which direction should a voltage-deviation check go?" Q board users — power quality engineers: use attribution to locate polluters and assess remediation.
In one sentence: the Q power quality board means quality and responsibility — harmonics, voltage deviation — answering "the power is dirty; who dirtied it".
A Q example: One data center used Q-01 harmonic responsibility to analyze branch contribution — it located a variable-frequency drive branch as the main harmonic source, so remediation had a target. The Q board's value is moving from "there are harmonics" to "who produces them" — responsibility makes remediation purposeful.
4. The E Energy Use Board (15): How Electricity Is Used
The E board's role — energy insight: which equipment uses the power and whether usage is excessive; E board representatives — NILM equipment disaggregation, load forecasting, specific consumption, efficiency assessment; The E board's output — breakdown and forecast: device-level usage from one total meter, future load prediction; Typical E-board questions — "Which equipment uses the power behind the total meter?" "How high will tomorrow's peak load go?" E board users — energy managers: use breakdown for specific consumption, forecasts for demand management.
In one sentence: the E energy use board means insight — NILM, load forecasting, specific consumption — answering "where is the electricity used and how much is coming".
An E example: One park used E-01 NILM to split one total meter into HVAC, elevator and pump curves — it found air conditioning idle consumption of 8% at night and optimized accordingly. The E board's value is seeing device-level usage without a meter per device — what is visible can be managed.
5. The C Conservation Board (10): How to Save
The C board's role — reduction actions: executable saving advice after problems are found; C board representatives — reactive compensation optimization, efficiency benchmarking, peak-valley strategy advice, saving potential assessment; The C board's output — actions: not "there is waste" but "how to save and how much"; Typical C-board questions — "How should reactive compensation switching be optimized?" "How much more can this workshop save?" C board users — energy managers and operations teams: use actions to implement retrofit projects.
In one sentence: the C conservation board means reduction actions — reactive compensation, efficiency optimization — answering "how to save and how much".
A C example: One commercial complex used the C board to analyze reactive compensation switching — after optimization the power factor held above 0.95 and demand-related electricity charges dropped. The C board's value is moving from finding problems to giving solutions — it is the landing point of the four boards.
6. The P0 Launch Set: S-02/Q-01/E-01/E-06
S-02 leakage drift — leakage hazard lead time: answers "is leakage getting worse"; Q-01 harmonic responsibility — harmonic attribution: answers "who produces the harmonics"; E-01 NILM — device-level disaggregation: answers "which equipment uses the power behind the total meter"; E-06 load forecasting — future load: answers "how high will tomorrow's peak go"; The P0 logic — four most common questions: leakage, harmonics, disaggregation, forecasting — covering most projects' most painful scenarios.
In one sentence: the P0 launch set is S-02 leakage drift, Q-01 harmonic responsibility, E-01 NILM and E-06 load forecasting — start with 4 to answer the 4 most common questions.
A P0 example: One hospital project launched S-02 for leakage (medical equipment leakage risk is high) and E-01 for equipment usage (central HVAC is the big consumer) — two models showed results within two weeks, then expanded on demand. P0 is not "only four" — it is "run four first", verify value, then expand the rest of the models by topic.
7. Special Topics: Transformer Life/UPS/Storage SOH/Charging-Pile Forecasting
Transformer life topic — pick life-related models from the S/E boards: oil temperature, loading, life-decrement forecasting; UPS topic — pick power quality models from the Q board: voltage swings, battery health, output quality; Storage SOH topic — pick E-board and health models: charge-discharge curves, SOH decay forecasting; Charging-pile forecasting topic — pick E-board load models: charging load curves, demand management; The topic logic — fix "equipment plus pain" first, then map to a board: equipment decides the board, pain decides the model.
In one sentence: special topics mean mapping equipment plus pain to a board — transformers to life, UPS to quality, storage to SOH, charging piles to load — fix the object, then pick the model.
A topic example: One storage plant cared about battery SOH decay, so it chose the storage health model with charge-discharge curves to spot abnormal decay; one charging station cared about peak demand, so it chose load forecasting for demand management. A topic is not a new system — it is locating the equipment and pain, then picking the matching model from the four boards.
8. The V1 to V1.5 to V2 Delivery Roadmap
V1 phase — P0 launch: S-02, Q-01, E-01, E-06 go live; V1.5 phase — topic expansion: transformer life, UPS, storage SOH, charging-pile forecasting topics go live; V2 phase — full delivery: all 67 models go live, configured by industry; The phasing logic — solve the most common problems first: verify value, expand topics, then deliver everything; The phasing benefit — usable results at every phase: no waiting for all 67 to be ready.
In one sentence: the roadmap is V1 four launches, V1.5 topic expansion, V2 all 67 — every phase delivers usable results and value compounds.
A phasing example: One group ran V1 with four P0 models to prove platform value (one month), V1.5 with transformer life and UPS topics (quarter two) and V2 with full configuration (second half) — each phase has deliverables and advances at its own pace. Phased delivery is not delay — it is priority-based rollout that lets value run first.
9. Back to YESLON: How Tianyan Engine V2.0 Lands
Tianyan Engine V2.0 — ships with the S/Q/E/C four boards and 67 models: safety, quality, usage and actions fully covered; The selection entry — the four-board map: locate the pain board, then pick models within it; The default P0 set — S-02/Q-01/E-01/E-06: the default launch for new projects, value delivered fast; Topic extensibility — transformer, UPS, storage and charging-pile topics enable on demand: the model library expands by industry; The phased delivery mechanism — the V1 to V1.5 to V2 roadmap: verifiable results each phase, avoiding a "wait for everything" stall.
In one sentence: Tianyan V2.0 is 67 models across four boards, map-based selection, a default P0 launch, topic expansion and three-phase delivery — a long model list is not scary; answer the four questions right first.
A landing example: One manufacturer deployed Tianyan V2.0: four P0 models launched; S-02 caught two leakage hazards early, E-01 broke down workshop-level usage and E-06 optimized demand declaration — about 8% of the quarterly electricity bill was saved. The 67 models are a capability pool, not a multiple-choice test — locate the pain with the board map, run P0 first, expand topics on demand — how many models is secondary; solving the problem first matters most.
Scope and Limitations
- The conclusions in this article are intended for LV distribution and electrical-safety sites. Criteria are compiled from public codes and FEXLINK product documentation, and product parameters follow the latest selection handbook and product knowledge base.
- Quantitative criteria (protection zone, discharge and residual voltage, earth resistance, thresholds and grading) hold under the preconditions stated in this article. Where the site voltage level, earthing arrangement, environmental category or load profile differs, the figures must be recalculated. Specific configurations involving Tianyan engine V2.0(S/Q/E/C four tracks) should be verified against actual circuit parameters.
- Specific product models and parameters are subject to the latest selection handbook and product knowledge base; this article does not constitute selection or procurement advice.
- Standard numbers cited here refer to the currently effective editions; when a standard is revised, the related quantitative conclusions must be re-checked.
- Deployment and implementation for specific projects must be carried out by qualified engineers based on site survey and design drawings.
Frequently Asked Questions
A Quick Guide to Tianyan's S/Q/E/C Model Family
The 67 models are organized into four boards: S safety (20 — insulation, leakage, three-phase unbalance and other hazard lead-time signals)